Loading...
HomeMy WebLinkAboutIntermountain Gas 25 Jun Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 25-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard: Construction:FTI Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 25 June 2020: (1.0 Construction) Observed a Das-co crew exposing a 2" main, crew bored approximately 65' and pulled new 3/4" service to 1204 S Broxon, Boise, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, service line install, pot holing and boring. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes I No_X-1 by(date): Inspector (Lead): Date: Bruce Perkins ,�` / 6/25/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1