Inspector(s): Perkins Date(s): 25-Jun-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard: Construction:FTI Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
25 June 2020: (1.0 Construction)
Observed a Das-co crew exposing a 2" main, crew bored approximately 65' and pulled new 3/4" service to 1204
S Broxon, Boise, Idaho.All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, service line install, pot holing and boring.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes I No_X-1 by(date):
Inspector (Lead): Date:
Bruce Perkins ,�` / 6/25/2020
Reviewer: Date:
Darrin Ulmer