HomeMy WebLinkAboutIntermountain Gas 25 Aug Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Dates): 25-Aug-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type&Time (1 day) I Total Inspection Days: 1
Standard:F-] Construction: F TI Training: F__] (T)(D)Integrity Management: El Incident: E]
M/M: F-1 Follow-up: F-1 OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
25 Aug 2020: (1.0 Construction)
Observed a Das-co crew installing W mains to 953 W Tida St and 4481 Girasolo Ave in Meridian Idaho. All
procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, plastic pipe joining, pressure testing,
bedding/backfilling
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job tickets.
Corrective Action Required: Follow-up Required: Yes No
Yes NoF X by (date):
Inspector (Lead): Date:
Bruce Perkins 8/25/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1