Loading...
HomeMy WebLinkAboutIntermountain Gas 25 Aug Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Dates): 25-Aug-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type&Time (1 day) I Total Inspection Days: 1 Standard:F-] Construction: F TI Training: F__] (T)(D)Integrity Management: El Incident: E] M/M: F-1 Follow-up: F-1 OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 25 Aug 2020: (1.0 Construction) Observed a Das-co crew installing W mains to 953 W Tida St and 4481 Girasolo Ave in Meridian Idaho. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, plastic pipe joining, pressure testing, bedding/backfilling Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job tickets. Corrective Action Required: Follow-up Required: Yes No Yes NoF X by (date): Inspector (Lead): Date: Bruce Perkins 8/25/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1