HomeMy WebLinkAboutIntermountain Gas 24 Jan Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 24-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard:F—] Construction:71 1 Training: F--] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
Jan 2020: (1.0 Construction)
Observed a Dasco crew locating/excavating stubs for installing a new service. Project was delayed as
contractor had supplies in the way. Typed up report
Areas observed during this project were: Excavating, line locating.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF X I by(date):
Inspector (lead): r; f '' Date:
Bruce Perkins �'' ' `f 1/24/2020
Reviewer: ZWJ Date:
IPUC Form 1