Loading...
HomeMy WebLinkAboutIntermountain Gas 24 Aug Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 24-Aug-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:FI Construction: � Training: F__] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 20 Aug 2020: (1.0 Construction) Observed a Das-co crew installing 1200' of 2" main off a 6" main using an electrofusion saddle fitting at 23188 El Paso Rd, Caldwell, Idaho. Homeowner had dug all trenches. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating and ectrofusion plastic joining . Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job tickets. Corrective Action Required: Follow-up Required: Yes No YesF1 No X by (date): Inspector (Lead): % y� Date: Bruce Perkins 8/24/2020 Reviewer: Date: Darrin Ulmerj�3q > � IPUC Form 1