HomeMy WebLinkAboutIntermountain Gas 24 Aug Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 24-Aug-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:FI Construction: � Training: F__] (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
20 Aug 2020: (1.0 Construction)
Observed a Das-co crew installing 1200' of 2" main off a 6" main using an electrofusion saddle fitting at 23188 El
Paso Rd, Caldwell, Idaho. Homeowner had dug all trenches. All procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating and ectrofusion plastic joining .
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job tickets.
Corrective Action Required: Follow-up Required: Yes No
YesF1 No X by (date):
Inspector (Lead): % y� Date:
Bruce Perkins 8/24/2020
Reviewer: Date:
Darrin Ulmerj�3q > �