Loading...
HomeMy WebLinkAboutIntermountain Gas 23 Jun Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 23-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 1 Standard:F-] Construction:FI Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 23 June 2020: (1.0 Construction) Observed a Das-co crew extending 2" main approximately 60' and installing new 3/4" service to 26 N Joseph, Nampa, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, service line install, pressure testing, backfilling, met-fit couplings, pot holing and boring. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): Date: Bruce Perkins r f 6/23/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1