HomeMy WebLinkAboutIntermountain Gas 23 Jun Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 23-Jun-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days:1 1
Standard:F-] Construction:FI Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
23 June 2020: (1.0 Construction)
Observed a Das-co crew extending 2" main approximately 60' and installing new 3/4" service to 26 N Joseph,
Nampa, Idaho.All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, service line install, pressure testing,
backfilling, met-fit couplings, pot holing and boring.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF X by(date):
Inspector (Lead): Date:
Bruce Perkins r f 6/23/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1