HomeMy WebLinkAboutIntermountain Gas 22-23 Jun Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Ulmer I Date(s): 22-23 Jun 2020
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Day :1 2
Standard:F--] Construction: F2 Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
22 Jun 2020: (1 Construction)
Observed DasCo crew wrap the ends of the 12" steel pipe with Trenton wax tape, CAD weld leads onto the pipe,
cover, prime and wrap CAD welds, install test point post, install anode, and relocated a service line. Proper
procedures were followed.
23 Jun 2020: (1 Construction)
Observed DasCo crew install two other test point posts connecting the two lead wires, pad and backfill a section
of the 4" steel and plastic pipe, conduct general cleanup and complete this project. Proper procedures were
followed.
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for employees are located in file for the project.
Corrective Action Required: o w p equired: Yes No X
Yes X No [1/14' by(date):
Inspector (Lead): Date:
Reviewer: Date: