Inspector(s): I Perkins I Date(s): 22-Jun-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:FI Construction:FTI Training: F—] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
22 June 2020: (1.0 Construction/typed report)
Observed a Das-co crew installing a new W service line to a 4875 W. Eagle Landing Ct in Eagle, Idaho. All
procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, service line install, pressure testing and
backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X 17by(date):
Inspector (lead): % Date:
Bruce Perkins Y` 6/22/2020