Loading...
HomeMy WebLinkAboutIntermountain Gas 22 Jun Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 22-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:FI Construction:FTI Training: F—] (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 22 June 2020: (1.0 Construction/typed report) Observed a Das-co crew installing a new W service line to a 4875 W. Eagle Landing Ct in Eagle, Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, service line install, pressure testing and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X 1­7by(date): Inspector (lead): % Date: Bruce Perkins Y` 6/22/2020 Reviewer: ��� Date: Darrin Ulmer �- IPUC Form 1