HomeMy WebLinkAboutIntermountain Gas 21-24 Sep Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 21-24 Sep 2020
Company/Owner: Intermountain Gas Company Unit/OPID: T 8160
Inspection Type&Time (1 day) Total Inspection Days: 4
Standard: Construction:F4 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
21-24 Sep 2020: (4.0 Construction)
Observed a Das-co crew extending a 4" steel main at 33400 Orchard Access, Boise, Idaho. All procedures were
followed. Typed up report.
Areas observed during this project were: Excavating, line locating,welding, EFV installation, material handling,
backfilling/bedding,jeeping and coating repair
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No
Yes No X by (date):
Inspector (Lead): i' Date:
Bruce Perkins f 9/28/2020
Reviewer: Date:
Darrin Ulmer V '20 zo