Loading...
HomeMy WebLinkAboutIntermountain Gas 21-24 Sep Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 21-24 Sep 2020 Company/Owner: Intermountain Gas Company Unit/OPID: T 8160 Inspection Type&Time (1 day) Total Inspection Days: 4 Standard: Construction:F4 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 21-24 Sep 2020: (4.0 Construction) Observed a Das-co crew extending a 4" steel main at 33400 Orchard Access, Boise, Idaho. All procedures were followed. Typed up report. Areas observed during this project were: Excavating, line locating,welding, EFV installation, material handling, backfilling/bedding,jeeping and coating repair Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No Yes No X by (date): Inspector (Lead): i' Date: Bruce Perkins f 9/28/2020 Reviewer: Date: Darrin Ulmer V '20 zo IPUC Form 1