HomeMy WebLinkAboutIntermountain Gas 21 Oct Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 21-Oct-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:F-1 Construction: 1-1 1 Training: F___] (T)(D) Integrity Management: E:1 Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
21 Oct 2020: (1.0 Construction)
Observed a Das-co crew installing new W service lines at 8256/8317/8337/8357 E Conant St, Nampa, Idaho. All
procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, pressure testing, EFV install,
bedding/backfilling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job ticket.
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF 71 by (date):
Inspector(Lead): �� Date:
Bruce Perkins 10/21/2020
Reviewer: Date:
Darrin Ulmer dk4