Loading...
HomeMy WebLinkAboutIntermountain Gas 20 Oct Homedale Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 20-Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard: Construction:� Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 20 Oct 2020: (1.0 Construction) Observed a Das-co crew line locating, excavating and boring for a new W service line at 126 W. Oregon Ave, Homedale, Idaho. Bore crew bored into a 10" irrigation line after misjudging the size of the line. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating and boring. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): , Date: Bruce Perkins I l A 10/20/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1