HomeMy WebLinkAboutIntermountain Gas 20 Oct Homedale Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 20-Oct-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard: Construction:� Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
20 Oct 2020: (1.0 Construction)
Observed a Das-co crew line locating, excavating and boring for a new W service line at 126 W. Oregon Ave,
Homedale, Idaho. Bore crew bored into a 10" irrigation line after misjudging the size of the line. All procedures
were followed.Typed up report.
Areas observed during this project were: Excavating, line locating and boring.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job ticket.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): , Date:
Bruce Perkins I l A 10/20/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1