Loading...
HomeMy WebLinkAboutIntermountain Gas 20 Aug Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 20-Aug-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 1 Standard: Construction:F1 Training: F__] (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 20 Aug 2020: (1.0 Construction) Observed a Das-co crew installing a new%" service line at 1527 N Pineview Lane, Boise, Idaho. Contractor installed the new line and a stub with Continental cap and go. When pressure testing the line, a leak was discovered on the cap and go at the inlet and outlet. Fitting was cut out and submitted to IGC for testing or sending back to manufacturer for testing. (Possible Failed Fiting Report)All procedures were followed.Typed Observed a Das-co crew installing a new 3/" service line at 235 W Addeson St, Meridian, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job tickets and failed fitting. Corrective Action Required: Follow-up Required: Yes X No YesF71 No X Failed Fitting Report? by(date): 20-Feb-21 Inspector (Lead): Date: Bruce Perkins !f � 8/20/2020 Reviewer: r'` A Date: Darrin Ulmer le IPUC Form 1