HomeMy WebLinkAboutIntermountain Gas 19,26 May Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 119,26 May 202
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 2
Standard:F-] Construction: F2 Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
19,26 May 2020: (1.5 Construction, .5 typed report)
Observed a Dasco crew Abandoning 2" steel line and laying new 4" steel parallel at Park Center& Baybrook
Boise, Idaho.All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, welding, bedding,backfilling, pipe wrapping
and jeeping,
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): ' Date:
Bruce Perkins ` '"' C'%' 5/26/2020
Reviewer: Date:
Darrin Ulmer / MCI ;WOW
IPUC Form 1