Loading...
HomeMy WebLinkAboutIntermountain Gas 19,26 May Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 119,26 May 202 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 2 Standard:F-] Construction: F2 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 19,26 May 2020: (1.5 Construction, .5 typed report) Observed a Dasco crew Abandoning 2" steel line and laying new 4" steel parallel at Park Center& Baybrook Boise, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, welding, bedding,backfilling, pipe wrapping and jeeping, Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): ' Date: Bruce Perkins ` '"' C'%' 5/26/2020 Reviewer: Date: Darrin Ulmer / MCI ;WOW IPUC Form 1