Loading...
HomeMy WebLinkAboutIntermountain Gas 19 Oct Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 1 Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 1 Standard:FI Construction:� Training: F—] (T)(D) Integrity Management: Incident: M/M: F7 Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 19 Oct 2020: (1.0 Construction) Observed a Das-co crew installing a new W service line after tapping off a 2" steel main at 426/430 1st Ave N, Nampa, Idaho. Discovered existing gas leak on old abandoned line.All procedures were followed. Typed up report. Areas observed during this project were: Excavating, line locating, steel brazing, EFV installation Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yes No X Yes No 71 by (date): Inspector (Lead): �,- , Date: Bruce Perkins " 10/19/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1