Loading...
HomeMy WebLinkAboutIntermountain Gas 16 Nov Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 16-Nov-20 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 1 Standard:F—] Construction:F71 Training: F__J (T)(D)Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 16 November 2020(1.0) construction) Observed a Das-co crew installing a new W service lines and stubs at 2605/2624 E Ashlar Dr, Meridian, Idaho. All procedures were followed. Typed up report. Areas observed during this project were: Excavating, line locating, pressure testing, EFV install, bedding/backfilling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Bruce Perkins 16-Nov-202y? Reviewer: Date: Darrin UlmerAw�Ak 1,1V 2PZO IPUC Form 1