Inspector(s): Perkins Date(s): 15-Oct-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type&Time (1 day) Total Inspection Days: 1
Standard: Construction:FTI Training: F__� (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
15 Oct 2020: (1.0 Construction)
Observed a Das-co crew installing a new W service line after tapping off a 2" steel main at 12029 W Camas St,
Boise, Idaho. All procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, plastic joining, backfilling, bedding, pressure
testing, EFV installation, boring and welding
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job ticket.
Corrective Action Required: Follow-up Required: Yes No X
YesF7 No FX-1 by(date):
Inspector (Lead): Date:
Bruce Perkins 10/15/2020
Reviewer: Date:
Darrin Ulmer o