Loading...
HomeMy WebLinkAboutIntermountain Gas 15 Oct Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 15-Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type&Time (1 day) Total Inspection Days: 1 Standard: Construction:FTI Training: F__� (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 15 Oct 2020: (1.0 Construction) Observed a Das-co crew installing a new W service line after tapping off a 2" steel main at 12029 W Camas St, Boise, Idaho. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, plastic joining, backfilling, bedding, pressure testing, EFV installation, boring and welding Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yes No X YesF7 No FX-1 by(date): Inspector (Lead): Date: Bruce Perkins 10/15/2020 Reviewer: Date: Darrin Ulmer o IPUC Form 1