HomeMy WebLinkAboutIntermountain Gas 15 Jul Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins I Date(s): 15-Jul-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard: Construction:FTI Training: (T)(D) Integrity Management: Incident:
M/W Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
15 Jul 2020: (1.0 Construction)
Observed a Das-co crew installing a new W service line at 1653 W Island Green Dr, Meridian, Idaho.All
procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure
testing and EFV test.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by (date):
Inspector (Lead): - ; Date:
Bruce Perkins %".� - '"� 7/15/2020
Reviewer: �� Date:
Darrin Ulmer
IPUC Form 1