Loading...
HomeMy WebLinkAboutIntermountain Gas 15 Jul Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins I Date(s): 15-Jul-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard: Construction:FTI Training: (T)(D) Integrity Management: Incident: M/W Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 15 Jul 2020: (1.0 Construction) Observed a Das-co crew installing a new W service line at 1653 W Island Green Dr, Meridian, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by (date): Inspector (Lead): - ; Date: Bruce Perkins %".� - '"� 7/15/2020 Reviewer: �� Date: Darrin Ulmer IPUC Form 1