HomeMy WebLinkAboutIntermountain Gas 14 Jul Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 14-Jul-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F-] Construction: F,I Training: F-] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: a Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
14 Jul 2020: (1.0 Construction)
Observed a Das-co crew installing a new W service line after tapping off a 2" steel line at 2700 S. Pond, Boise,
Idaho. All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, potholing, thumping, welding, plastic joining,
backfilling, pressure testing and EFV test.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
Bruce Perkins 7/14/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1