Loading...
HomeMy WebLinkAboutIntermountain Gas 14 Jul Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 14-Jul-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F-] Construction: F,I Training: F-] (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: a Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 14 Jul 2020: (1.0 Construction) Observed a Das-co crew installing a new W service line after tapping off a 2" steel line at 2700 S. Pond, Boise, Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, potholing, thumping, welding, plastic joining, backfilling, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins 7/14/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1