Loading...
HomeMy WebLinkAboutIntermountain Gas 12 AUG Middleton Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 12-Aug-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:F-1 Construction:F-1-1 Training: F__] (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 12 Aug 2020: (1.0 Construction) Observed a Das-co crew installing a new%" service lines and stubs at 561 Heliopolis Way, Star Idaho and 8362 Fountain Spring Ct, Middleton Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins 8/12/2020 Reviewer: Date: Darrin Ulmer 01 IPUC Form 1