HomeMy WebLinkAboutIntermountain Gas 12 AUG Middleton Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 12-Aug-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard:F-1 Construction:F-1-1 Training: F__] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
12 Aug 2020: (1.0 Construction)
Observed a Das-co crew installing a new%" service lines and stubs at 561 Heliopolis Way, Star Idaho and
8362 Fountain Spring Ct, Middleton Idaho.All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure
testing and EFV test.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
Bruce Perkins 8/12/2020
Reviewer: Date:
Darrin Ulmer
01
IPUC Form 1