Loading...
HomeMy WebLinkAboutIntermountain Gas 13 Jul Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 13-Jul-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:F� Construction: FI Training: (T)(D)Integrity Management: El Incident: M/M: F-1 Follow-up: F7 OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 13 Jul 2020: (1.0 Construction) Observed a Das-co crew installing a new W service line at 6194 W Los Flores Dr, Meridian, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, backfilling, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No FX_1 by(date): Inspector (Lead): ;%' / Date: Bruce Perkins ' / 7/13/2020 Reviewer: Date: Darrin Ulmer _ IPUC Form 1