Loading...
HomeMy WebLinkAboutIntermountain Gas 11-14 May Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 11-14 May 202 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days: 4 StandardT-1 Construction:F4 Training: F__] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 11-14 May 2020: (3.5 Construction, .5 typed report) Observed a Dasco crew abandon service line 6842-371 and HPSS, replace with new service and tie into low pressure main at 617 Northside Blvd in Nampa. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, boring, welding, abandonment, bedding and backfilling, EFV installation, tie-in/hot tapping, service line install and pressure testing. Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins G-�Z,'A,� 5/14/2020 Reviewer: Date: Darrin Ulmer 7 IPUC Form 1