Loading...
HomeMy WebLinkAboutIntermountain Gas 11 Aug Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 11-Aug-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard: Construction: Fil Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 11 Aug 2020: (1.0 Construction) Observed a Das-co crew installing a new W service lines at 774/758/790 Nannyberry, Kuna, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure testing and EFV test. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesl No X Yes7l No X by(date): Inspector (Lead): Date: Bruce Perkins 8/11/2020 Reviewer: Date: Darrin Ulmer , ^ �A) IPUC Form 1