HomeMy WebLinkAboutIntermountain Gas 11 Aug Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 11-Aug-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard: Construction: Fil Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
11 Aug 2020: (1.0 Construction)
Observed a Das-co crew installing a new W service lines at 774/758/790 Nannyberry, Kuna, Idaho.All
procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, plastic joining, backfilling/bedding, pressure
testing and EFV test.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesl No X
Yes7l No X by(date):
Inspector (Lead): Date:
Bruce Perkins 8/11/2020
Reviewer: Date:
Darrin Ulmer , ^ �A)
IPUC Form 1