HomeMy WebLinkAboutIntermountain Gas 10 Jan Eagle Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I I Date(s): 10-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard: Construction:� Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
10 Jan 2020: (1.0 Construction)
Observed a Dasco crew installing a new service. They used proper bedding and shading procedures as
well as squeezing procedures. Pressure tested the service and tied it in. Typed up report
Areas observed during this project were: Excavating, line locating, bedding/shading, pressure testing and EFV
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector(Lead): Date:
Bruce Perkins _—v—� � 1/10/2020
Reviewer: � Date:
I• 21) ZC