HomeMy WebLinkAboutIntermountain Gas 9 Jul Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 9-Jul-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F—] Construction: FTI Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
9 Jul 2020: (1.0 Construction)
Observed a Das-co crew boring 300', line locating, trenching/shore box and welding at 1155 Caldwell Blvd,
Caldwell, Idaho.All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, welding, pot holing and boring.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): �, Date:
Bruce Perkins ' 7/9/2020
Reviewer: Date:
Darrin Ulmer i-5 4,.,,(V .2c-zl
IPUC Form 1