Loading...
HomeMy WebLinkAboutIntermountain Gas 9 Jul Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 9-Jul-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F—] Construction: FTI Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 9 Jul 2020: (1.0 Construction) Observed a Das-co crew boring 300', line locating, trenching/shore box and welding at 1155 Caldwell Blvd, Caldwell, Idaho.All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, welding, pot holing and boring. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): �, Date: Bruce Perkins ' 7/9/2020 Reviewer: Date: Darrin Ulmer i-5 4,.,,(V .2c-zl IPUC Form 1