HomeMy WebLinkAboutIntermountain Gas 9 Jan Greenleaf Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins Date(s): 9-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type&Time (1 day) Total Inspection Days: 1
Standard: Construction:71 1 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
09 Jan 2020: (1.0 Construction)
Observed a Dasco crew installing a new service. The crew did an initial safety briefing, located/marked
the gas main with locator. Hand dug and exposed the gas main, dug 2 access holes with backhoe and
thumpered under the road. Typed up report
Areas observed during this project were: Excavating, Line locating and Thumpering
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
YesF71 No X by(date):
Inspector (Lead): Date:
Bruce Perkins 1/9/2020
Reviewer: Date:
r * 20
IPUC Form 1