HomeMy WebLinkAboutIntermountain Gas 7 Jan (2) Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer/Perkins Date(s): 7-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days:-2
Standard:F� Construction:F2 Training: F—] (T)(D) Integrity Management: E::] Incident:
M/M: = Follow-up: a OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
07 Jan 2020: (2.0 Construction)
Observed a Dasco crew installing a new service. The crew lead continually used backhoe when digging
within 2' of the pipe, additionally joiner did not clean pipe correctly prior to pushing into continental
fitting. Pressure tested the service and tied it in. Typed up report
Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling and Joining
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesi No X
YesF7 No X by(date):
Inspector (Lead): / Date:
Bruce Perkins 1/7/2020
Reviewer: Date:
IPUC Form 1