Loading...
HomeMy WebLinkAboutIntermountain Gas 7 Jan (2) Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins Date(s): 7-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days:-2 Standard:F� Construction:F2 Training: F—] (T)(D) Integrity Management: E::] Incident: M/M: = Follow-up: a OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 07 Jan 2020: (2.0 Construction) Observed a Dasco crew installing a new service. The crew lead continually used backhoe when digging within 2' of the pipe, additionally joiner did not clean pipe correctly prior to pushing into continental fitting. Pressure tested the service and tied it in. Typed up report Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling and Joining Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesi No X YesF7 No X by(date): Inspector (Lead): / Date: Bruce Perkins 1/7/2020 Reviewer: Date: IPUC Form 1