Loading...
HomeMy WebLinkAboutIntermountain Gas 4 Jun Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 4-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F7 Construction: F T] Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 4 June 2020: (.8 Construction, .2 typed report) Observed a Das-co crew installing a new W service line to a generator while tapping off a 4" steel main at 6906 E Teresa Dr in Boise, Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, EFV installation, service line install, pressure testing, welding and wrapping. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (lead): ;;�% Date: Bruce Perkins y% 6/4/2020 Reviewer: Date: Darrin Ulmer 11�-u IPUC Form 1