HomeMy WebLinkAboutIntermountain Gas 4 Jun Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 4-Jun-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F7 Construction: F T] Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
4 June 2020: (.8 Construction, .2 typed report)
Observed a Das-co crew installing a new W service line to a generator while tapping off a 4" steel main at 6906
E Teresa Dr in Boise, Idaho. All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, EFV installation, service line install, pressure
testing, welding and wrapping.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (lead): ;;�% Date:
Bruce Perkins y% 6/4/2020
Reviewer: Date:
Darrin Ulmer 11�-u
IPUC Form 1