Loading...
HomeMy WebLinkAbout20240903IPC to Staff 21(c) Supplemental - Attachment 1 - RFP - T902 Construction - Addendum NO 2.pdf / "IDAW IL-POWER. An IDACORP Ccmpany ADDENDUM NO. 02 2023 Line 902 RTSN-DRAM TO: All Prospective Respondents RE: Request for Bid—Zycus Event#1319897753 The following items are addressed in this Addendum No.02: 1. Attachments: Line 902 RTSN-DRAM Reel Summary.pdf 2. Clarifications/Info: Bid Close Date has been extended to 12/01/23 at 5PM MST 3. Submitted Questions&Answers: 1) Can you furnish the conductor reel lengths,weights and sizes? Answer: Please see the attach Reel Summary for reel lengths for OPGW,the shield wire,and the conductor. We do not have reel sizes(diameter)or weights yet. 2) Can you please furnish all OPGW splice locations?The structure list provides location only for the new structures, if there are any on existing structures there not identified. Answer: OPGW splice boxes are to be installed on Structures 1249C, 1272, 1308, 1338, 1375, 1414, 1433, 1464, 1496,and 1526B 3) Is there any additional work on the existing tangent structures other then the conductor assembly units? Answer: No 4) Can we get an extension? Answer:The bid closing will be pushed out to 12/01/23 at 5:00 PM MST. Respondent shall provide acknowledgement of this Addendum No.02 within the Zycus event. Failure to provide such acknowledgement may render the bid as non-responsive and subject to rejection.