Loading...
HomeMy WebLinkAbout20240909IPC to Staff 100 - Attachment 2.pdf 9/5/24, 12:50 PM CLRIS Accounts Call Center Online Reports Profiles Forecasts Systems Web Maps PI System Budget ID Maintenance(expanded)for #35739 Scope Document Add Budget ID Last Query_ New Query_ Main Menu Budget ID IT409210001 Title IT409 10-year inspection repairs,Brady-Fremont-Kinport 138kV Solution 7045 Location T409-LINE#409 138 kV-Brady-Fremont-Terry-Siphon-Kinpc v Submitted 05/06/2020 Co-Deps: Category Transmission J By Whom I PLS5566 Status Authorized v Origin IT&D Engineering&Reliability CCI Leader I Woodburn,Cole v Master Project Transmission 10-yr Inspection Follow-Up Estimated In Srvc 12/15/2024 Master Group Date Completed 2-Compliance v B v Program No v Purchase Asset Replacement INo v EIM Impact No v �v Complexity High v Repair or replace deteriorated poles,crossarms,and insulators identified during the Pole Inspection and ground line Treatment Program and the annual routine Line Patrols. OPGW may be required. Correct issues identified during detailed aerial inspection,ground line inspection and outstanding Priority 2 and 3 defects identified by patrolmen. d (if no action) May result in reduced reliability. Equipment failure could lead to an extensive outage and possible property damage. d Related Info Line 409 was originally built in 1943 The Ten Year Maintenance Plan for this line begins in 2022 with the Pole Inspection and Groundline Treatment followed by design in 2023 and construction in 2024.The PNUF-PFTP section is radial feed to PNUF sub. d JL Options Evaluated d Status 12/27/2022:(JG)Year and cost data has been updated from the server...12/21/2022 MJS:Assigned Cole Woodburn as PL. 12/19/2022:(JG) Comments Project determined to NOT have an EIM impact.Set EIM Impact to NO....6/16/2022 DJP:Updated Scope that is may require OPGW per Cyr. 2021-09-17(update via code)Status set to Authorized per Mark Stute. . ..7/27/2020(LB)Updated title to new 10 Year Inspection Repair Li naming convention...5/6/2020:(JG)Created BID for this Ten Year Maintenance project.Once the Corrective Action Plan is completed,a detailed estimate will need to replace the existing estimate and MSP schedule. l Environmental Raptor zone d Right-of-Way BIA,BLM,private d clris/Products/Budgets/ProjectUpdate.cfm?ProjNo=35739&CC=577&CFID=106449&CFTOKEN=35df123bf0695dd4-A2D34334-08BB-0084-51 C7CF486262ECFF 1/2 9/5/24, 12:50 PM CLRIS Permitting BIA,BLM,traffic control,canal crossing,railroad crossing d Outages will need to be coordinated Legacy Agrmt Contract Long Lead Attachments Refresh T409 v Attachments for Projects should be stored in//Fresno/CUSTOMERLR/CLRIS Attachments. Budget&Costs Initial Scope Design Port Mmgt Actual Account Sp CC Type Estimate Estimate Estimate Estimate Benefit To Date Capital v 577 v 33-Transmission Lines C F= 515000 0.000 1509002.87 Detailed Cost Estimates Aut Car Def Rev Date Rev By Year ❑ ❑ SD-Scope&Design v 12/27/2022 Gray,Jesse v 2023 42,958 0 19 ❑ ElDC-Design&Construction v 12/18/2023 Sullivan,Melissa v 2024 1,179,085 0 12 ❑ ❑ v 07/16/2024 Sullivan,Melissa v 2025 0 Add or Delete Year and linked information? All 1,222,666 0 Replace Detailed Estimate with Project Schedule Forecast O Portfolio Managed Project O Portfolio Reviewed Change Log clris/Products/Budgets/ProjectUpdate.cfm?ProjNo=35739&CC=577&CFID=106449&CFTOKEN=35df123bf0695dd4-A2D34334-08BB-0084-51 C7CF486262ECFF 2/2