HomeMy WebLinkAbout20240909IPC to Staff 94(e) - Attachment 6 - HCPR190001 BOP Commissioning HCPR_AUTOSPILL_GATE_1_COMMISSIONOING.pdf SPILLGATE 1 COMMISSIONING 1. 1\0 CHECKOUT 480V OFF 2. SPILLGATE #1 IN OFF POSITION 3. REMOVE LOTO 4. POWER 480VAC 5. PUT SPILLGATE #1 IN MANUAL 6. UNPLUG DRUM ENCODER, VERIFY ALARM AND NO MOVEMENT 7. UNWIRE GATE ENCODER, VERIFY ALARM AND NO MOVEMENT 8. RAISE SPILLGATE WITH MANUAL CONTROL 9. VERIFY ENCODER ROTATION 10.STOP SPILLGATE RAISE 11.LOWER SPILLGATE WITH MANUAL CONTROL 12.STOP SPILLGATE WHEN CORRECT SLACK IS ACHIEVED 13.ZERO DRUM ENCODER, THIS IS OUR STOP. 14.VERIFY GATE IS UNAVAILIBLE AFTER LOWERING IN MANUAL 15.RAISE SPILLGATE WITH MANUAL CONTROL TO 1 FOOT 16.SWITCH CONTROL TO AUTO 17.LOWER SPILLGATE WITH AUTO CONTROL TO CLOSED 18.VERIFY GATE ENCODER OF 0 POSITION 19.VERIFY DRUM ENCODER OF 0 POSITION 20.VERIFY ENCODERS STOP SPILLGATE NOT LOWER LIMIT 21.VERIFY PROPER SLACK 22.RAISE SPILLGATE WITH SETPOINT 23.UNPLUG DRUM ENCODER, VERIFY ALARM AND SWITCH TO OTHER ENCODER, PLUG ENCODER BACK IN. 24.UNWIRE GATE ENCODER, VERIFY ALARM AND SWITCH TO OTHER ENCODER 25.UNPLUG DRUM ENCODER, VERIFY GATE BECOMES UNAVAILABLE WITH BOTH ENCODERS FAIL 26.PLUG DRUM ENCODER IN 27.REWIRE GATE ENCODER 28.LOWER WITH SETPOINT 29.CHANGE FAIL TO MOVE TIMER TO 5 SECONDS, OPEN SPILLGATE WITH SETPOINT AND VERIFY FAIL TO MOVE ALARM. CHANGE FAIL TO MOVE TIMER BACK TO ORIGINAL TIME. 30.VERIFY LOOKUP TABLE IS CORRECT FROM LAST SPILLGATE TEST AUTOSPILL TESTING 1. WIRE TESTING RELAY'S FOR 2 UNITS 2. WIRE PROCESS CALIBRATOR FOR 2 UNITS 3. VERIFY CORRECT CONTACTS ARE USED 4. TEST 1 SETUP —VERIFY SIREN WORKS CORRECTLY a. MS RELAY HIGH b. 94G RELAY LOW c. UNIT TRIP RELAY LOW d. UNIT FLOW AT 12 mA, 5077 CFS 5. TEST 1-UNIT TRIP a. UNIT TRIP RELAY FROM LOW TO HIGH b. 94G RELAY LOW c. MS RELAY FROM HIGH TO LOW d. VERIFY CFS MOVES TO 5077 e. VERIFY GATE OPENS TO CORRECT SETPOINT— 3 FT 6. TEST 2 SETUP a. MS RELAY HIGH b. 94G RELAY LOW c. UNIT TRIP RELAY LOW d. UNIT FLOW AT 12mA, 5077 CFS 7. TEST 2- 94G — UNWIRE SSI ENCODER a. MS RELAY HIGH b. 94G RELAY FROM LOW TO HIGH c. UNIT TRIP RELAY LOW d. VERIFY CFS MOVES MINUS SNL— 3676 — 1.8 FT e. VERIFY GATE SETPOINT - 3676 f. UNIT TRIP RELAY MOVE LOW TO HIGH g. VERIFY CFS SNL h. VERIFY GATE SETPOINT OPENING — 3 FT i. REWIRE SSI ENCODER 8. TEST 3 SETUP — UNPLUG DRUM ENCODER a. MS RELAY HIGH b. 94G RELAY LOW c. UNIT TRIP RELAY LOW d. UNIT FLOW AT 12mA, 5077 CFS 9. TEST 3 — 94G a. MS RELAY HIGH b. 94G RELAY MOVE LOW TO HIGH c. UNIT TRIP RELAY LOW d. VERIFY CFS MOVES MINUS SNL - 3680 e. DO NOT LET GATE GET TO SETPOINT f. UNIT TRIP RELAY MOVE FROM LOW TO HIGH g. MS RELAY MOVE FROM HIGH TO LOW h. VERIFY CFS MOVES SNL - 5080 i. VERIFY GATE SETPOINT OPENING — 3 FT j. PLUG DRUM ENCODER BACK IN 10.TEST 4 SETUP a. MS RELAY HIGH b. 94G RELAY LOW c. UNIT TRIP RELAY LOW d. UNIT CFS 6.2 mA, 1400 CFS 11.TEST 4 — STARTUP TRIP a. MS RELAY HIGH b. 94G RELAY LOW c. UNIT TRIP RELAY MOVE FROM LOW TO HIGH d. MS RELAY MOVE FORM HIGH TO LOW e. VERIFY CFS MOVE — 1400 CFS f. VERIFY GATE OPENING - .82 FT 12.TEST 5 SETUP — 2 UNIT TRIP a. U1 MS RELAY HIGH b. U1 94G RELAY LOW c. U1 UNIT TRIP RELAY LOW d. U1 CFS 16 mA, 7612 e. U2 MS RELAY HIGH f. U2 94G RELAY LOW g. U2 UNIT TRIP RELAY LOW h. U2 CFS 16 mA, 7612 13.Test 5 a. U1 UNIT TRIP RELAY FROM LOW TO HIGH b. U1 MS RELAY FROM HIGH TO LOW c. VERIFY CFS MOVE — 7612 CFS d. VERIFY GATE SETPOINT— 5 FT e. U2 94G RELAY FROM LOW TO HIGH f. VERIFY CFS MINUS SNL MOVE — 5200 CFS g. VERIFY GATE OPENING — 3.3 + 5 FT = 8.3 FT 14.TEST 6 SETUP — 2 GATES AVAILIBLE, 1 GATE FAIL TO MOVE a. MAKE PLC THINK GATE 2 IS AVAILIBLE b. MS RELAY HIGH c. 94G RELAY LOW d. UNIT TRIP RELAY LOW e. UNIT CFS 16 mA, 7500 CFS 15.TEST 6 a. UNIT TRIP RELAY FROM LOW TO HIGH b. MS RELAY FROM HIGH TO LOW c. VERIFY CFS MOVE — SHOULD SPLIT 2.3 ON EACH d. VERIFY GATE FAIL TO MOVE e. VERIFY SETPOINT GETS MOVED TO AVAILIBLE GATE — 4.6 FT 16.TEST 7 SETUP — 3 GATES AVAILIBLE, 2 GATE FAIL TO MOVE a. U1 MS RELAY HIGH b. U1 94G RELAY LOW c. U1 UNIT TRIP RELAY LOW d. U1 CFS 16 mA, 7500 CFS 17.TEST 7 a. FAIL TO MOVE TIMER GATE 2 — 20S, GATE 3 — 40S b. UNIT TRIP RELAY FROM LOW TO HIGH c. MS RELAY FROM HIGH TO LOW d. VERIFY CFS MOVE — SHOULD SPLIT 7500 CFS e. VERIFY GATE OPEN — 1.5 FT PER GATE f. VERIFY GATE FAIL TO MOVE — GATE 2 g. VERIFY GATE FAIL TO MOVE — GATE 3 h. VERIFY SETPOINT GETS MOVED TO AVAILIBLE GATE — 5 FT EMS CHECKOUT 1. VERIFY SPILLGATE ALARMS 2. VERIFY SETPOINT CONTROL FOR RAISING 3. VERIFY SETPOINT CONTROL FOR LOWERING DEREK VANDERMEER CSS 5/27/2024