HomeMy WebLinkAbout20240909IPC to Staff 94(e) - Attachment 5 - HCPR190001 UNIT 2 Commissioning Hells Canyon Unit 2 Commissioning Plan_v0.pdf Hells Canyon Unit 2 Commissioning Plan - MASTER Individual will Initial Each Line when Complete, Each Section will be signed when complete Pre-Start-Up Checks (All Complete Prior To 4/10/2024) Runner ❑ Measure and record the runner clearances ❑ Record the elevation of the runner band and crown seals relative to the surfaces of the corresponding stationary parts Turbine Pit ❑ Verify all walkways are secured ❑ Clean up all tools, parts and liquids Scroll Case ❑ Confirm all scroll case and draft tube drains are clear of equipment and free of debris ❑ Make sure piezometer taps are clear and that piping is correctly attached ❑ Confirm the scroll case and draft tube access doors are closed and secured Stator ❑ Megger each phase ❑ Megger the stator Rotor ❑ Perform post-assembly electrical testing prior to installation ❑ DC winding resistance Test ❑ Pole Drop Test ❑ AC Hi Pot—5000V ❑ Insulation Resistance and Polarization Index—1000 Vdc ❑ Perform post-installation electrical testing ❑ Insulation Resistance and Polarization Index—1000 Vdc&500Vdc(used as baseline for future maintenance testing)w/Field Bus ❑ Make sure the rotor components(spider, balance weights,covers, blades)are secure and that no foreign objects are present Generator ❑ Inspect the entire stator area and upper bracket, including the air gap,for foreign objects ❑ Take a set of stator air gap readings-Mechanical ❑ Make sure rotor shrouds and fan blade clearances are acceptable/RTD's as well ❑ Inspect brake piping for leaks ❑ Operate the brakes ❑ Confirm operation of all brake system switches/notifications(gap sensors) ❑ Confirm Brake start cycle setting,currently set to 30%speed,we will confirm this works as we commission unit.Confirm the speed switch setting for the brake actuation is set no higher than 30%synchronous speed. ❑ Mapping of soleplate cracking, per Tim Ferguson document 1IPage Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only Bearings (thrust bearing, turbine guide, generator guide) ❑ Verify oil piping has been flushed and new filters installed including new TGB Filter ❑ Confirm correct oil levels (visual and indicated) ❑ Confirm the bearing oil level alarms and Trips are operational from LL and HH Level Switches. ❑ Confirm the bearing temperature measurements are accurate and calibrated ❑ Verify oil pump(s)are operational and flow rates are acceptable ❑ Inspect the oil piping for leaks ❑ Verify proper operation of high-pressure lift pump system. ❑ Check bearing pumps for oil flow and no aerating of the oil. ❑ Record bearing clearances ❑ Make sure that old THB cooler water is off,and we are using the plate exchanger Governor ❑ Inspect the cabinet, piping,sumps and servos for oil and air leaks ❑ Make sure the accumulator tank oil level is correct, ❑ High/Low alarm check, High/Low Trips. ❑ Mock-Up operation of governor system without operating unit. ❑ Operate the wicket gates: ❑ Verify the wicket gate position sensor operates correctly ❑ Verify the gates operate smoothly and do not bind ❑ Record the gate opening and closing times(nominal 10 sec)w/prop valve ❑ Record the gate opening and closing times(nominal 10 sec)w/Emergency shut down ❑ Verify cushioning and squeeze ❑ High Level—Low pressure gate stroke check and low level—low pressure check ❑ Make sure servomotor lock engages and disengages ❑ Verify Speed Probe gap settings are correct&functioning(bench test) Electrical ❑ Install new generator protective relay settings and verify relay operation ❑ Test all protective relay input and output circuits ❑ Test generator CT circuits—push current and verify polarity ❑ Test generator breaker trip and close circuits ❑ Verify DFR operation ❑ Test Governor control and shutdown circuits ❑ Test turbine mechanical and electrical over-speed circuits ❑ Test Emergency Gate-drop circuits ❑ Test 86E Lockout. ❑ Test PLC 86N, 94G,5G. Fill out paperwork ❑ Visually inspect all undervoltage relay's. Fill out paperwork ❑ Test unit control circuits ❑ Test AVR circuits ❑ Visual AVR Transformer ❑ Complete and check TMS circuits and shutdowns. Bearings,stator etc. ❑ Test SCADA control, alarm and indication circuits ❑ Verify EMS points and controls ❑ Verify PI points are in PI ❑ Test AC and DC turbine bearing oil pump operation ❑ Test oil level,flow,and pressure circuits,Turbine guide and Thrust Bearing 2 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Test oil pump control circuits,Turbine Guide and Thrust Bearing ❑ Test oil level trip circuits,Turbine Guide and Thrust Bearing ❑ Test RTD circuits ❑ Test lift pump operation, permissive operation,and pressure switch ❑ Test brake circuit equipment, operation and other systems permissive operation. ❑ Test broken wicket gate indication equipment ❑ Dry run of the wicket gate assembly with a governor shutdown. 100%to-2%gate ❑ Check servo timing and cushion ❑ Field Ground Relay—Positive,then Negative to ground. ❑ Make connections for performing Running Impedance Test ❑ Verify all trip test switches are closed. Slow Roll - By Hand -Mechanics ❑ Check lift and delay on lift, inform techs/controls of delay to be added to startup to accommodate time-to-lift. ❑ If the unit is unable to move by hand, it may be required to slow roll the unit with water. o Headgate will be cracked to fill the penstock. Headgate will then be closed. o Gates will be crack open to allow water to flow and slow spin the unit. o Perform as needed. Creep Detect- By Hand -Techs ❑ Verify Creep Detect operates, manually move SSG to initiate creep ❑ Verify loss of speed probes. No speed on start up after xx seconds.Verify brake logic so they will be disabled. Depression Operation (There are not a depression air compressor at Hells Canyon) ❑ Run compressors unloaded run-time(prior to commissioning week) Perform Overspeed tests (Bench) (202X OPEN) ❑ Test Mechanical Overspeed trip devices. ❑ Verify proper trip and shutdown of unit after an overspeed trip. Unit Shut Down (Bench) (202X OPEN) ❑ Verify the unit can shutdown successfully before proceeding further ❑ Pre-Start Up Checks Complete - Signatures Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title 3 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only Name,Title Name,Title Unit Start-Up Procedure (202X OPEN) ❑ Prior to Start-Up (202X OPEN) - Record Timeframe ❑ Verify all test instrumentation is turned on and working Variable Sensor Wicket Gate Position PLC Penstock Pressure PLC Scroll Case Pressure PLC Unit Speed PLC Penstock Flow PLC Breaker Open/Closed PLC AC RMS Voltage(Running EE Power Supply and Impedance Test) Transducer AC RMS Current(Running EE Power Supply and Impedance Test) Transducer ❑ Watering Up - Record Timeframe ❑ Functional test of Creep detection, move SSG by hand and verify lift pump starts,and brakes release ❑ Reset Creep detect ❑ Apply the rotor brakes manually ❑ Crack to fill and inspect for areas of leakage:JR Merit to be present for water up and penstock coupling commissioning(modify JR Merit will not be present)—Send them an email. ❑ All access hatches ❑ Turbine shaft seal ❑ Wicket gate stems ❑ Head cover flange ❑ Vent piping ❑ Headgate raising Process: ❑ Raise gate to full open, attach indication cable to gate ❑ Lower Gate, Full closed,Set PLC Zero ❑ Open crack to fill, set in PLC ❑ Initiate emergency gate-drop via E-Stop button ❑ Raise gate to full open,verify correct elevation in PLC 4 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Open cooling water valves and check piping for leaks ❑ Confirm cooling water flow is present ❑ Confirm operation of cooling water flow alarms ❑ Confirm water flow to the bearing coolers and stator air coolers ❑ Check oil levels to make sure levels are not rising(indication of a water leak into reservoir) ❑ Make sure governor accumulator tank is at full pressure and the oil is at normal level ❑ Set up bearing temp trend in the PLC ❑ Test creep function by moving SSG gear by hand and verifying lift pump starts, brakes release and associated alarms are correct.Verify creep reset. ❑ Record the headwater and tailwater elevations= ❑ Low Speed Checks (202X OPEN) - Record Timeframe ❑ Verify in PLC when Master Start is initiated the gate limit will remain at 0% ❑ Verify Unit is in Local Control ❑ Verify brakes have been disabled,we will use brakes valving at governor ❑ Verify 70OG breaker close output trip jack is open and tagged. ❑ Verify 30OG & M3425A manual sync check trip jacks are open and tagged ❑ Using Master Start,start unit ❑ Keeping gate limit at 0%,Verify we get a Breakaway fail and 86N lockout. ❑ Reset lockout and re-start unit. ❑ Increase gate limit until the unit spins ❑ Use master stop to close wicket gates ❑ Manually apply brakes to stop unit ❑ Slow Build to Overspeed trip test (202X OPEN) - Record Timeframe ❑ Set Runaway overspeed trip at 10%of rated speed ❑ Verify Unit is in Local Control ❑ Verify Brakes are back in Auto Position ❑ Set gate limit to 10% ❑ Using Master Start,start unit ❑ Verify Runaway overspeed trip @ 10%of rated speed ❑ Verify unit shuts down properly ❑ Listen for unusual noises ❑ Make sure the brake pads are clear of the runner ❑ Verify Virbosystm is recording the shaft runout ❑ Verify Vribosystm is monitoring the air gap ❑ Record bearing temps. ❑ Slow Build to Speed No Load (202X OPEN) - Record Timeframe ❑ Set Runaway overspeed trip to normal 170%of rated speed ❑ Verify Unit is in Local Control ❑ Verify in PLC when Master Start is initiated,the gate limit will remain at 0% ❑ Trend bearing temps ❑ Using Master Start,start unit ❑ Increase gate limit to start unit spinning 5 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Verify Fail to build speed trips unit. ❑ Move Fail to build speed timer to allow slow roll ❑ Start Unit. ❑ Increase gate limit to control unit ❑ Verify Governor has control of unit at rated speed ❑ Operate the 86N using one of the trip inputs,verify unit shuts down properly. ❑ Restart Unit with the above procedure. ❑ Operate the 94G using one of the trip inputs, hold input high until the 5G operates and verify Unit shuts down properly. ❑ Restart Unit with the above procedure. ❑ First offline governor tuning ❑ With Unit at SNL, lower gate limit to reduce Unit speed by 3%, move gate limit to 25%, record prop valve and wicket gate movement. Tune governor until satisfied. ❑ With Unit at SNL, lower gate limit to reduce Unit speed by 5%, move gate limit to 25%, record prop valve and wicket gate movement. Tune Governor until satisfied. ❑ Listen for unusual noises ❑ Make sure the brake pads are clear of the runner ❑ Verify Virbosystm is recording the shaft runout ❑ Verify Vribosystm is monitoring the air gap ❑ Trend bearing temps in PLC ❑ Use master stop to shut down the unit ❑ Test monitoring speed every minute during slowdown, How long does it take to get to braking speed? ❑ Record time it takes unit to spin down to brake cycle start speed. ❑ Normal Start to Speed No Load (202X OPEN) - Record Timeframe ❑ Verify Unit is in Local Control ❑ Verify Gate Limit has been set back to normal start up20% ❑ Trend bearing temps in PLC ❑ Using Master Start,start unit ❑ Verify Governor catches and controls unit at rated speed. Verify the Governor tuning is acceptable, if not perform tuning steps again. ❑ Perform Running Impedance test (202X OPEN) - Record Timeframe ❑ Verify Unit is in Local Control (Only use the flukes for this test) ❑ Defeat timers as needed ❑ Verify Gate Limit is set to 0%for start up ❑ Trend bearing temps in PLC ❑ Using Master Start,start unit ❑ Using Gate Limit, increase to 3%or more until unit spins ❑ Under manual control, bring the unit up at 2%gate increments to rated speed. Holding a couple minutes at each position for record collection. ❑ Gather impedance data while unit is rotating.Then bring the unit down in same 2%increments,and review data. ❑ Passing test is no instantaneous impedance changes of 3%and no more that 10%throughout the test. ❑ Using Master Stop,stop unit 6 1 P a g e Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ AVR on (DECS on) (202X OPEN) - Record Timeframe ❑ Remove Running Impedance test leads ❑ Install Field leads ❑ Verify Unit is in Local Control ❑ Verify AVR start is not disabled ❑ Trend bearing temps in PLC ❑ Trend the Shunt field and Main field in the PLC ❑ Verify AVR is in FCR mode and at correct setting to slowly build voltage ❑ Using Master Start,start unit ❑ When unit is at Sync speed,start AVR ❑ Bring the generator to rated terminal voltage incrementally(FCR mode). ❑ Perform relay check. Verify relays are metering correct voltage magnitude and phase sequence. Capture oscillography from relay to perform voltage waveform verification. ❑ Verify Virbosystm is recording the shaft runout and air gap ❑ Check the turbine shaft seal for leakage ❑ Review the penstock and scroll case pressure readings ❑ Review AVR operation and performance. If performance is unacceptable,tune AVR(approximately 2 hour) (FCR to AVR Mode). ❑ Starting with existing settings, perform step responses in FCR Mode and verify stability. Upon step test and record review response.Changes may be required.Another step response will follow to verify stability. Repeat as required.Verify Sequence values in DECS. ❑ Transfer to AVR Mode. Perform step test with procedure same as above. ❑ Verify OEL Operation. ❑ Stop unit using Master Stop and record shutdown from the DECS. ❑ Verify Unit is in Remote ❑ Verify 70OG breaker close output trip jack is open and tagged. ❑ Verify 30OG& M3425A manual sync check trip jacks are open and tagged ❑ Verify AVR is in AVR mode ❑ Using Master Start,start unit ❑ Verify at 95%rated speed the AVR starts automatically.Verify proper field flash.Soft start settings record. Adjust if required. (Stop and restart AVR if needed) ❑ Voltage matching and sequence of operation.Verify voltage matching control, adjust as needed. ❑ Verify Gov tuning after AVR tuning, might need to make fine adjustments ❑ Stop Unit and make changes to protective relay's ❑ Saturation Test(Min Voltage from Exciter to 110%voltage,Approx. 60 minutes.) ❑ Restore Protective relay settings ❑ Protective relay breaker trips ❑ 201X open and 201Z closed ❑ Close and trip that breaker from all protective relays,trip 1 and trip 2 ❑ Close and trip breaker by rolling the 86E lockout ❑ Ready to close the 201X. Phase Check, Close 202X, and perform phase check across 202Z (202X CLOSED) 7 1 P a g e Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Release clearance on 202X (202X CLOSED) - Record Timeframe ❑ Check phasing with 230kV sticks ❑ Step 1 ❑ Verify Unit is in Remote ❑ Verify 70OG breaker close trip jack is out and tagged ❑ Verify 30OG & M3425A manual sync check trip jacks are open and tagged ❑ Start Unit ❑ Phase-check across 201Z on all three phases to sync scope ❑ Step 2 ❑ Phase-check the manual sync check of 30OG and Beckwith to sync scope. ❑ Step 3 ❑ Phase-check auto sync relay to sync scope. Sync Unit Online and Perform Load Testing (202X CLOSED) ❑ Generator Breaker Closure (202Z OPEN)— Record Timeframe ❑ Verify 70OG breaker close output is closed and tagged removed ❑ Verify 30OG & M3425A manual sync check trip jacks are open and tagged ❑ Verify Unit is in Remote Control ❑ Using Master Start,start unit ❑ Transfer Unit back to Local control ❑ Manually sync the unit on using Sync Scope, one manual sync relay and Breaker close switch. ❑ Open Breaker, leave unit running ❑ Manually sync the unit on using Sync Scope,second manual sync relay and Breaker close switch. ❑ Place Unit in Remote Control ❑ Verify 70OG starts and Syncs Unit online ❑ Online Protection trips (202X CLOSED) - Record Timeframe ❑ Unit Online and Breaker closed. ❑ Issue 86N trip using one of the inputs. ❑ Verify Unit shuts down properly. ❑ Restart Unit ❑ Lower Over Speed trip from 105%to 99% ❑ Verify 94G operation and breaker open. ❑ Verify 5G timer and 5G trip. ❑ Verify Unit shuts down properly. ❑ Open breaker on HPLP, using HPLP bypass button start unit to verify Black Start Condition. 8 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Online Governor Tuning (202X CLOSED) - Record Timeframe ❑ Verify Unit is in Remote Control ❑ Using Master Start, start unit ❑ Verify 70OG syncs unit online ❑ Ensure governor goes to min loading set point ❑ Transfer between governor mods and verify it is bump less ❑ Online Gov tuning ❑ Perform a 1% per second gate movement of 20%. Record prop valve and wicket gate movement. Tune governor until satisfied. ❑ Perform a 3% per second gate movement of 20%. Record prop valve and wicket gate movement. Tune governor until satisfied. ❑ Loading to Minimum (Record Value ) and unity power factor for AVR Tuning - Record Timeframe ❑ Load the unit to 5%of full power. ❑ Every fifteen minutes record the shaft runout readings(Vibrosystm) ❑ Every fifteen minutes record the generator air gap(Vibrosystm) ❑ Trend bearing temps in PLC ❑ Check the turbine shaft seal for leakage ❑ Review the scroll case and draft tube pressure readings ❑ Trip unit from this operating point,while recording data with the DECS-400. ❑ Reload the unit to MW ❑ Collect PD test data for this operating condition (Low Load—Cold Machine,Approx.. 20min) ❑ Verify voltage across coupler terminations. ❑ Review AVR operation and performance. If performance is unacceptable,tune AVR. (about 2 hours) ❑ Review OEL response stability online. ❑ Review UEL Response. Perform AVR Step Responses and review, make gain adjustments as required. Record final step response. ❑ Perform verification of electrical quantities in all energized protective relays,AVR, DFR, meters,etc. ❑ Verify values into PI and reporting correctly. ❑ Adjust the voltage set point to achieve the maximum WAR output up to the overexcitation limiter in the AVR. Collect MOD-025 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Balance Vars with sister machine. ❑ Adjust the voltage set point to achieve the minimum MVAR output up to the under-excitation limiter in the AVR. Collect MOD-025 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Balance Vars with sister machine. ❑ Loading to 12.57o Capacity ( MW) (Max before Rough Zone) - Record Timeframe ❑ Load the unit to 12.5%of full power and unity power factor. ❑ Every fifteen minutes record the shaft runout readings(Vibrosystm) ❑ Every fifteen minutes record the generator air gap (Vibrosystm) 9 1 P a g e Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Trend bearing temps in PLC ❑ Check the turbine shaft seal for leakage ❑ Review the scroll case and draft tube pressure readings ❑ Collect PD test data for this operating condition (Low Load—Cold Machine) ❑ Review AVR operation and performance. If performance is unacceptable,tune AVR. ❑ Perform a step test and review. ❑ Tune PSS(Primary&Secondary)—May adjust MW range(12.5%-40%) ❑ Determine local mode oscillation ❑ Perform frequency sweep. Collect uncompensated VAR-501 information.Adjust time constants& apply calculate compensation. ❑ Determine the PSS lead-lag coefficients ❑ Capture Uncompensated Bode plot with calculated compensation for VAR-501 verification. ❑ Adjust PSS Gains&Output limiters, perform step response to verify stability. ❑ Verify OEL and UEL with PSS Active. ❑ Perform verification of electrical quantities in all energized protective relays,AVR, DFR, meters,etc.,A record must be remote started and reviewed.We are not able to see real-time in the DFR. ❑ Collect generator 3rd harmonic data using SEL-30OG ❑ Adjust the voltage set point to achieve+20 MVAR. Collect MOD-026 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Adjust the voltage set point to achieve-20 MVAR. Collect MOD-026 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Return unit to unity power factor. ❑ Proceed to loading the unit in steps to the best-efficiency power(BEP)and then to full load. The steps can be: 40%( ) 60%( )75%( MW),90%( MW),and 100%( MW). These positions can vary,depending on the SNL and BEP wicket gate positions. The usual rough zone,typically in the middle range of load,should be avoided.At each loading point: ❑ Adjust the voltage set point to achieve+20 MVAR. Collect MOD-026 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Adjust the voltage set point to achieve-20 MVAR. Collect MOD-026 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ At each loading position per above, review AVR& PSS operation and performance. If performance is unacceptable,tune AVR. Perform step test and review response. May require to reduce loading. ❑ During AVR Tuning perform governor step responses below. ❑ Get data for steady state for about 3-5 minutes at each load ❑ Inject a positive and negative 0.3 Hz frequency at each loading level ❑ With a 5%droop=>10%change in gate position. ❑ Load to 25%(_MW) ❑ Starting Gate position= Ending Gate Position = ❑ Time for Step= Time to return= ❑ Load to 50%( MW) ❑ Starting Gate position = Ending Gate Position = ❑ Time for Step= Time to return = ❑ Load to 75%( MW) ❑ Starting Gate position = Ending Gate Position= ❑ Time for Step= Time to return= ❑ Load to Pmax( MW) ❑ Starting Gate position = Ending Gate Position= ❑ Time for Step= Time to return= 10 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Take readings while allowing the bearing temperatures to stabilize at each setting(consider running overnight to heat soak bearings for quicker stabilization) ❑ Return unit to unity power factor. ❑ Collect PD test data while the machine is at 100%rated output(High Load—Hot Machine) if possible. ❑ Finalize AVR, PSS and VAR-501 commissioning - Record Timeframe ❑ Online Voltage Setpoint Step Test-While operating at the BEP and after the above data points have been collected,adjust the voltage set point to set the stator voltage to approximately 100%of nominal with PSS on. Once stable, perform a 10 second 2%step in the voltage setpoint using the DECS-400. Multiple step responses will be performed. ❑ While operating at 100%rated output,adjust the voltage set point to achieve the minimum MVAR output up to the under-excitation limiter in the AVR. Collect MOD-025 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Balance Vars with sister machine. ❑ While operating at 100%rated output,adjust the voltage set point to achieve the maximum MVAR output up to the overexcitation limiter in the AVR. Hold this operating point for one hour. Collect MOD-025 data using the DECS-400 and collect generator 3rd harmonic data using SEL-300G. ❑ Balance Vars with sister machine. ❑ Load Rejections - Record Timeframe ❑ Verify all sensors are wired out and ready to record load rejections ❑ Verify Auto Spill PLC input from Unit#1 is landed ❑ Verify Unit is in Remote Control ❑ Start Unit and open gates to 20% ❑ Start Recording data ❑ Trip Unit by rolling 86E lockout ❑ Verify Auto Spill matches unit CFS ❑ Stop Auto Spill and close Spill gate if opened ❑ Unwire Auto Spill PLC input from Unit#1 ❑ Verify test data is within limits ❑ Start Unit and open gates to 40% ❑ Start Recoding data ❑ Trip Unit by rolling 86E lockout ❑ Verify test data is within limits ❑ Start Unit and open gates to 60% ❑ Trip Unit by rolling 86E lockout ❑ Verify test data is within limits ❑ Start Unit and open gates to 80% ❑ Start Recording data ❑ Trip Unit by rolling 86E lockout ❑ Verify test data is within limits ❑ Start Unit and open gates to 100%or Maximum allowed gate limit ❑ Start Recording data ❑ Trip Unit by rolling 86E lockout 11 Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only ❑ Verify test data is within limits ❑ If any of this test data is not within limits,we will stop and re-evaluate. ❑ Scroll case pressure not to exceed 125 PSI, Nominal scroll case pressure is 100 PSI ❑ Final Controls Check- Record Time Frame ❑ Final 86N trip, using LL gov pressure trip,verify breaker does not open before wicket gates are closed. Verify head gate drop quits timing when breaker opens. ❑ Verify all control panel switches and gauges are working and calibrated. ❑ Verify all Wonder Ware buttons for Raise/Lower operate correctly ❑ Verify EMS controls and alarms ❑ Verify PSS compliance operates correctly to EMS and Plant SCADA. ❑ Verify Delta Temps compliance ❑ Verify NPDES flows ❑ Close Local Service breaker and verify phase rotation at ATS switch,switch local service to this source ❑ Verify all timers have been returned to normal ❑ Verify all overspeed trips have been returned to normal ❑ Verify PLC has no forced points ❑ Verify PI points and values ❑ Heat Run - Record Time Frame ❑ After a successful start-up test, perform a heat run of the generator ❑ Operate the unit at(approximately 145MW) until the generator stator temperatures stabilize ❑ Record the bearing temperatures as the stator heats up. ❑ Record the stator temperatures, identify the hottest temperature sensors,these will become the drivers during normal operation ❑ Verify cooling water valve operation is modulating. ❑ Record bearing temps ❑ Measure the generator air gap as the stator heats up ❑ Final Soleplate Inspection - Record Time Frame ❑ Apply LOTO to the unit to allow for access to the brake pit ❑ Complete final inspection and mapping of the soleplate cracking ❑ Additional Testing and Unit Released for Commercial Ops - Record Time Frame ❑ Perform additional testing as required (compliance testing, etc). ❑ Release for Commercial Operation. ❑ Final Commissioning Complete, Unit Release for Commercial Operation- Signatures 121 Page Revised 05/03/2023 Hells Canyon Rewind nncl Control System Upgrade Commissioning Plan Internal Use Only Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title Name,Title 131Page Revised 05/03/2023 Hells Canyon Rewind find Control System Upgrade Commissioning Plan Internal Use Only