HomeMy WebLinkAbout20240909IPC to Staff 85-105 - Redacted Response.pdf -UIQAW POWER, LISA D. NORDSTROM Lead Counsel RECEIVED Inordstrom(WJdahopower.com Monday, September 09, 2024 IDAHO PUBLIC September 9, 2024 UTILITIES COMMISSION VIA ELECTRONIC FILING Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd., Bldg 8, Suite 201-A (83714) PO Box 83720 Boise, Idaho 83720-0074 Re: Case No. IPC-E-24-07 Application of Idaho Power Company for Authority to Increase Rates for Electric Service to Recover Costs Associated with Incremental Capital Investments and Certain Ongoing Operations and Maintenance Expenses Dear Commission Secretary: Attached for electronic filing, please find Idaho Power Company's Response to the Twelfth Production Request of the Commission Staff to Idaho Power Company. Due to the collectively voluminous confidential and non-confidential information provided in response to data requests in this case, the Company is posting the attachments to these requests to the secure FTP site to allow parties to view the requested information remotely unless otherwise noted in the response. Because certain attachments contain confidential information, the FTP site is divided between confidential and non-confidential information. The login information for the non-confidential portion of the FTP site has been provided to all parties that have intervened to date. The login information for the confidential portion of the FTP site will be provided to the parties that execute the Protective Agreement in this matter. When downloading the zip folder, please save the zip file to your desktop to avoid any errors with the lengthy file names. If you have any questions about the attached filing, please do not hesitate to contact me. Very truly yours, p"0l "P. 0ta(Crh�.r.� Lisa D. Nordstrom LDN:sg Enclosures CERTIFICATE OF ATTORNEY ASSERTION THAT INFORMATION CONTAINED IN AN IDAHO PUBLIC UTILITIES COMMISSION FILING IS PROTECTED FROM PUBLIC INSPECTION Case No. IPC-E-24-07 Idaho Power Company's Application for Authority to Increase Rates for Electric Service to Recover Costs Associated with Incremental Capital Investments and Certain Ongoing Operations and Maintenance Expenses The undersigned attorney, in accordance with Commission Rules of Procedure 67, believes that some of the attachments to Request Nos. 85, 86, 87, 88, 89, 90,93, 94, 95, 96, 97, 98, 99, 100, 101, 102, and 105 to Idaho Power Company's Response to the Twelfth Production Request of the Commission Staff dated September 9, 2024, contains information that Idaho Power Company and/or a third party claim are trade secrets, business records of a private enterprise required by law to be submitted to or inspected by a public agency, and/or public records exempt from disclosure by state or federal law (material nonpublic information under U.S. Securities and Exchange Commission Regulation FD)as described in Idaho Code § 74-101, et seq., and/or § 48-801, et seq. As such, it is protected from public disclosure and exempt from public inspection, examination, or copying. DATED this 9t" day of September 2024. LISA D. NORDSTROM Attorney for Idaho Power Company LISA D. NORDSTROM (ISB No. 5733) DONOVAN E. WALKER (ISB No. 5921) MEGAN GOICOECHEA ALLEN (ISB No. 7623) Idaho Power Company 1221 West Idaho Street (83702) P.O. Box 70 Boise, Idaho 83707 Telephone: (208) 388-5825 Facsimile: (208) 388-6936 Inordstrom(aMdahopower.com dwalker idahopower.com mgoicoecheaallenCabidahopower.com Attorneys for Idaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION ) OF IDAHO POWER COMPANY TO ) CASE NO. IPC-E-24-07 INCREASE RATES FOR ELECTRIC ) SERVICE TO RECOVER COSTS ) IDAHO POWER COMPANY'S ASSOCIATED WITH INCREMENTAL ) RESPONSE TO THE TWELFTH CAPITAL INVESTMENTS AND ) PRODUCTION REQUEST OF THE CERTAIN ONGOING OPERATIONS ) COMMISSION STAFF TO IDAHO AND MAINTENANCE EXPENSES. ) POWER COMES NOW, Idaho Power Company ("Idaho Power" or "Company"), and in response to the Twelfth Production Request of the Commission Staff ("Commission" or "Staff") to Idaho Power Company dated August 26, 2024, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 1 REQUEST FOR PRODUCTION NO. 85: In reference to the Company's response to Staff Production Request No. 31 b — Attachment 4, for the bid scorecard for the Engineering Design Oxbow Hatchery Renovation Project, please provide a detailed explanation and evidence for each of the criteria to arrive at a final score for each of the bids. Please also provide the price for each of the bids. RESPONSE TO REQUEST FOR PRODUCTION NO. 85: Evaluation of engineering design bids was led by Idaho Power employees no longer with the Company therefore detailed explanations and justifications for why each score was assigned to each criterion is not available. However, Idaho Power can provide an explanation based on standard bid evaluation practices. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 2 1 1 1 1 1 IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 3 —Please see the Response to Request for Production No. 85 — Confidential Attachments 1 and 2 for a copy of the bids with pricing. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER-4 REQUEST FOR PRODUCTION NO. 86: In reference to the Company's response to Staff Production Request No. 31(b)(i) for construction inspection work of the Oxbow Hatchery Renovation Project, please provide the bid price information, bid scorecard, and criteria and any other documentation for the three vendors the Company contacted directly to perform the work. RESPONSE TO REQUEST FOR PRODUCTION NO. 86: As explained in the Company's Response to Request for Production No. 31(b)(i), a formal Request for Bids was not issued for construction inspection services because of the specialized services required. Rather, Idaho Power contacted three known vendors directly, requesting a bid for the work necessary. However, the bid information received for construction inspection services from Schnabel Engineering was provided as the Response to Request for Production No. 31(b) — Confidential Attachment 6. Schnabel Engineering's proposal for construction inspection support is identified as Tasks 1 through 3. Work outlined in Tasks 1 and 3 is specific to Construction support work, while Task 2 is specific to the work referred to as Construction Inspection for this project. Please see the Response to Request for Production No. 86 — Confidential Attachment for bid information received from River Structures Consulting, which includes correspondence associated with the rate, construction experience, and a resume for inspector that was proposed to be onsite. The Company planned to proceed with River Structures Consulting for construction inspection services for the hatchery renovation, but the resource was allocated to another project and no additional inspectors were available. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 5 REQUEST FOR PRODUCTION NO. 87: In reference to the Company's response to Production Request No. 31(d) — Confidential Attachment 4 — COs — Engineering Design, please explain why Change Order #2 is for work contracted with SCHNABEL engineering for construction support when the engineering design was originally assigned to Deere & Ault Consultants Inc. Additionally, please provide a detailed breakdown (i.e. engineering staff rate and hours, subcontractors' work, etc.) of the $44,210 increase. RESPONSE TO REQUEST FOR PRODUCTION NO. 87: Deere & Ault changed names during the design process of the project therefore Change Order #2 reflects the new company name, Schnabel Engineering. Note, the same engineering firm and project team completed the work. Please see the Response to Request for Production No. 87 — Confidential Attachment for the Change Order Request from Schnabel Engineering that initiated Change Order #2. The attachment includes a narrative that discusses the proposed design changes and a schedule of values based on engineering man hours supporting the increase. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELVTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 6 REQUEST FOR PRODUCTION NO. 88: In reference to the Company's response to Staff Production Request No. 31(d) — Confidential Attachment 5 — COs — Construction for the Oxbow Hatchery Renovation Project, please explain the escalation cost included in Change Order #1 attributed to the FERC permission delay (i.e. Rebar Escalation, Overhead Door Escalation, Crowder Control Panel Escalation, Structural Steel Escalation, and Permitting Delay Related Costs), even though Change Order #2 was attributed to an increase in the contract amount due to the FERC permission delay. RESPONSE TO REQUEST FOR PRODUCTION NO. 88: Change Order No. 1 was associated with the additional costs resulting from the escalation of rebar, overhead door, crowder control panels, and structural steel costs. These were incurred by the contractor when purchasing material at time of procurement for construction relative to the costs provided at time of bid. While the project was delayed for FERC permitting, the contractor continued to procure certain materials for the project. Please see the Response to Request for Production No. 88 — Confidential Attachments 1 through 4, for the change order requests from the contractor specific to rebar, overhead door, crowder control panels, and structural steel escalation costs supporting Change Order#1. The escalation cost included in Change Order #1 titled Permitting Delay Related Costs are addressed in Change Directive ("CD") 016, included as the Response to Request for Production No. 88 — Confidential Attachment 5. CD 016 pertains to the delay in the start of the river intake construction as a result of the FERC permitting taking longer than anticipated. A scope of work summarized as constructing the river water intake structure was scheduled to begin March 1, 2022, but was not authorized to begin until June 20, 2022. Costs for allocated manpower, equipment, and resources were committed IDAHO POWER COMPANY'S RESPONSE TO THE TWELVTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 7 to this project by contractor. CD 016 - Intake Permit Delays and the Change Order Request #16 — Intake Construction Start Delay Costs include a narrative and cost breakdown outlining the reasoning for the costs incurred with delay. Change Order #2 also addresses costs incurred by contractor for the one-year delay for the entire hatchery renovation scope but is associated with committed resources, equipment, a full mobilization, and other efforts put forth for the start of construction that resulted from the majority of the scope being put on hold for one year. Additionally, material escalation costs for other material purchases not captured in Change Order#1 are included in Change Order#2 as well. For clarification, CD 016 within Change Order #1 addresses permitting delay costs solely for the intake structure portion of work. Change Order #2 addresses permitting delay costs associated with remaining scope of the project which is described as a complete hatchery and site renovation. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 8 REQUEST FOR PRODUCTION NO. 89: In reference to the Company's response to Staff Production Request No. 31(d)- Confidential Attachment 6 — COs — Construction Support for Construction Support in the Oxbow Hatchery Project, please explain the contract increase Order #2 and provide any additional information and documents to support the increase. RESPONSE TO REQUEST FOR PRODUCTION NO. 89: Change Order #2 addresses additional engineering support for the construction phase of the project. Requested changes in design determined during construction, and labor rate increases due to inflation, contributed to the need for a change order. Please see the Response to Request for Production No. 89 — Confidential Attachment, which includes a breakdown of the increased costs proposed by Schnabel Engineering for the estimated time and cost to support the remaining duration of construction. Page 3 details the estimated services and quantity of site visits, shop visits for fabrication items, and assumptions of remaining volume of documents that will require engineering review for construction support. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 9 REQUEST FOR PRODUCTION NO. 90: In reference to the Company's response to Staff Production Request No.31(d)- Confidential Attachment 6 — COs — Construction Support for the Oxbow Hatchery Renovation Project, please explain the — increase in Change Order#4 (i.e. RFI, invoices, cost estimates from subconsultants, etc.) and provide any additional information and documents to support the increase. RESPONSE TO REQUEST FOR PRODUCTION NO. 90: Change Order #4 addresses costs for the construction support services from the engineer of record for the remaining duration of construction. The costs are attributed to higher than anticipated labor and time spent on construction support. Throughout construction, changes to the original design drawings were necessary, requiring revisions by Schnabel Engineer to move forward and construct. Construction support includes but is not limited to submittal review, Request for Information review, design clarifications, drawing revisions, and additional engineering design for requested changes. Please see the Response to Request for Production Request No. 90 — Confidential Attachment for Schnabel Engineering's proposal of the estimated time and cost to support the remaining duration of construction, ultimately resulting in Change Order#4. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 10 REQUEST FOR PRODUCTION NO. 91: In reference to the Company's response to Staff Production Request No. 31(d) — Confidential Attachment 7 — COs - Construction Inspection for the Oxbow Hatchery Renovation Project, please justify the — increase in cost in Change Order #1. Please include any documentation showing a change in the Scope of Work and the incremental cost from the original contract. RESPONSE TO REQUEST FOR PRODUCTION NO. 91: Change Order #1 addresses the costs for the remaining construction inspection services for the duration of the desired inspection. The costs are attributed to higher than anticipated labor and time. Additionally, the contractor providing construction inspection services was contracted to complete materials testing (concrete, compaction, and welding tests)for the project which was not initially contemplated. Idaho Power requested an estimated monthly cost for the remainder of the project— which was then multiplied by the estimated 10 months remaining for the total change order request. Additional documentation is not available as a proposal was submitted for this change. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 11 REQUEST FOR PRODUCTION NO. 92: In reference to the Company's response to Staff Production Request No. 31(d) —Attachment 1 —WBS the total cost for the Oxbow Hatchery Renovation Project is $25,506,884.63 and the cost of the remaining work is $3,807,331.62. However, in Response to Production Request No. 3 Attachment 3 — Larkin Workpaper 3 — Incremental Plant Determination, $26,209,352.45 is required for total projected closing. Please reconcile the difference between the two amounts. Additionally, the total contract cost as shown in Response to Production Request No. 31(d) — Confidential Attachments 4 through 7 is with change orders, as shown in the below table. Please reconcile it with the total projected closing cost reflected in Response to Production Request No. 3. Categories Final Cost Engineering Design Construction Construction Support Construction Inspection Total RESPONSE TO REQUEST FOR PRODUCTION NO. 92: Please note, the total project cost presented in Mr. Larkin's Workpaper 3 includes Allowance for Funds Used During Construction ("AFUDC") and overheads while the Work Breakdown Structure ("WBS") and Change Orders do not. Further, the amounts presented in Mr. Larkin's Workpaper 3 were estimates at the time Idaho Power developed the test year presented in this case. The costs included in the WBS would be more representative of the current project cost estimate, excluding AFUDC and overheads. Note, the Company anticipates an additional $200,000 in project costs prior to conclusion of construction that is not IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 12 reflected within the WBS. Finally, the total contract cost shown in the Response to Request for Production No. 31(d) — Confidential Attachments 4 through 7 includes on those costs associated with contracted purchased services for engineering design, construction contractor, construction support (engineer of record), and construction inspection and does not include internal Idaho Power labor, material purchases directly made by Company for the project, and other expenses associated with project incurred by Idaho Power. These costs are reflected in the WBS on lines 2, 3, and 6. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 13 REQUEST FOR PRODUCTION NO. 93: Please provide the following information for the AFPR Controls Modernization (AFPR140005) project referenced by Secondary Supplemental Response to Production Request No. 5. Please include any available workpapers with formula intact. If any of the information requested below cannot be provided or is not available, please explain why it is not available or cannot be provided. a. Please provide a detailed explanation for the need of the project including the analysis justifying the need. b. Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. c. If a Request for Proposal ("RIFF') or Request for Quote ("RFQ") was submitted, please provide the following information: i. A copy of the RFP or RFQ that was submitted; ii. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; iii. The short-list bidder scorecard; and iv. A copy of the winning bid. d. Please provide the approved Initial Project Plan including the following: i. Initial project scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the Initial Project Plan and budget were approved at the IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 14 appropriate level. e. Please provide the following for the Baseline Construction Project Plan including the following: i. Baseline project scope; ii. Baseline project budget broken down by Work-Breakdown Structure ("WBS"); iii. Baseline project schedule broken down by the WBS; iv. If the baseline construction project scope, budget, and/or schedule deviated from the Initial Project Plan, please explain the differences, explain the reason for the change, and provide evidence that the changes were approved at the appropriate level; V. Project status reports and action items; and vi. Contractor change orders. f. Please provide the following related to completion of the project: i. Baseline construction budget-to-actual comparison by the WBS and by year; ii. Baseline construction schedule-to-actual comparison by the WBS; iii. For any budget-to-actual cost overages by major WBS category that is over 5%, please explain the reason for the differences and provide evidence that the amount was approved at the appropriate level; and iv. Please explain any deviations in schedule from the baseline construction schedule. RESPONSE TO REQUEST FOR PRODUCTION NO. 93: a. The American Falls Power Plant ("AFPR") is the sixth highest generating facility in Idaho Power's hydroelectric fleet. This project involved the modernization of the IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 15 control and power distribution networks on all three units including installation of a new Plant Control System ("PLC") at the AFPR, including the protection system, the governor, the remote terminal unit ("RTU"), the graphical user interface ("GUI"), the human-machine interface ("HMI") and the control switchboard. The unit PLC controls the unit operation, the governor, the governor oil system, intake gate and auxiliary equipment. Further, the new balance of plant PLC will control local service, station air compressors, spill gates, station sump pumps, unwatering pumps, fire water pump strainer, monitoring the line relaying, the aeration system and the diesel generator. The primary need for the project was related to the age of the equipment, which required increased maintenance and tuning. Upgrading the equipment will result in decreased frequency of required testing and maintenance, increased performance and unit efficiency, as well as better insight into plant conditions and operations. Please see the attachment provided in response to part (b) for a discussion of the consequences that would occur if the Company did not proceed with this project. b. Please see Response to Request for Production No. 93(b) — Confidential Attachment - AFPR140005 Alternatives Analysis. c. Please see the responses below. i. There were no competitive bidding solicitations for this project as it is standard equipment the Company uses across its hydro-fleet so the majority of the work was performed by Idaho Power personnel. However, the Company contracted the work required for assistance with the removal of old equipment and the installation of the new equipment (physical connections and equipment IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 16 placement). To do so, Idaho Power prepared a Contractor Summary of the work to be performed and the proposed project schedule and sent the summary to seven vendors. Please see Response to Request for Production No. 93(c) - Attachment 1 - AFPR140005 Contractor Summary. ii. The contractor summary was submitted to seven vendors, but only one vendor bid the project. The Company compared the bid price to the price of internal wiring crews, and determined the prices were comparable. iii. Not applicable. The Company only received one bid. iv. Please see Response to Request for Production No. 93(c) - Confidential Attachment 2 - AFPR140005 Bid. d. Please see the responses below. i. Please see Response to Request for Production No. 93(d) - Attachment 1 - AFPR140005 Project Plan and Response to Request for Production No. 93(d) - Confidential Attachment 2 - AFPR140005 Contract SOW. ii. Please see part (d)(i). iii. Please see part (d)(i). iv. Please see the Company's Response to Request for Production No. 17(a)(iv) for the project budget approval process. The creation of the AFPR Controls Modernization Budget ID AFPR140005 and corresponding approved budget amounts reflected in Response to Request for Production No.93(f) — Confidential Attachment 1 - AFPR140005 Completion Budget to Actual is evidence of approval of the initial budget. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 17 e. Please see the responses below. i. Please see Response to Request for Production No. 93(d) — Attachment 1 — AFPR14005 Project Plan. There were no changes to the scope following creation of the project plan. ii. Please see Response to Request for Production No. 93(e) — Attachment 1 — AFPR140005 Baseline Construction WBS. iii. Please see Response to Request for Production No. 93(e) — Attachment 1 — AFPR140005 Baseline Construction WBS. iv. Please see Response to Request for Production No. 93(e) — Attachment 2 — AFPR140005 Baseline Construction Variance Notes. V. Please see Response to Request for Production No. 93(e) — Attachment 3 — AFPR140005 Baseline Construction Summary Report and Response to Request for Production No. 93(e) — Attachment 4 — AFPR140005 Construction Checklist. vi. Not applicable. There were no change orders. f. Please see the responses below. i. Please see Response to Request for Production No.93(f) — Confidential Attachment 1 - AFPR140005 Completion Budget to Actual. ii. Please see Response to Request for Production No.93(f) - Attachment 2- AFPR140005 Completion Schedule to Actual. iii. Not applicable. However, see the Variance Notes provided in part (e)(iv) for an explanation of variances driving the budget updates. iv. Please see Response to Request for Production No. 93(e) — Attachment 3 — AFPR140005 Baseline Construction Summary Report. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 18 The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 19 REQUEST FOR PRODUCTION NO. 94: Please provide the following information for the HCPR Controls Modernization — Unit 3, Unit 1, BOP, Unit 2 (HCPR190001) project referenced by Secondary Supplemental Response to Production Request No. 5. Please include any available workpapers with formula intact. If any of the information requested below cannot be provided or is not available, please explain why it is not available or cannot be provided. a. Please provide a detailed explanation for the need of the project including the analysis justifying the need. b. Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. c. If a RFP or RFQ was submitted, please provide the following information: i. A copy of the RFP or RFQ that was submitted; ii. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; iii. The short-list bidder scorecard; and iv. A copy of the winning bid. d. Please provide the approved Initial Project Plan including the following: i. Initial project scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the Initial Project Plan and budget were approved at the IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 20 appropriate level. e. Please provide the following for the Baseline Construction Project Plan including the following: i. Baseline project scope; ii. Baseline project budget broken down by the WBS; iii. Baseline project schedule broken down by the WBS; iv. If the baseline construction project scope, budget, and/or schedule deviated from the Initial Project Plan, please explain the differences, explain the reason for the change, and provide evidence that the changes were approved at the appropriate level; V. Project status reports and action items; and vi. Contractor change orders. f. Please provide the following related to completion of the project: i. Baseline construction budget-to-actual comparison by the WBS and by year; ii. Baseline construction schedule-to-actual comparison by the WBS; iii. For any budget-to-actual cost overages by major WBS category that is over 5%, please explain the reason for the differences and provide evidence that the amount was approved at the appropriate level; and iv. Please explain any deviations in schedule from the baseline construction schedule. RESPONSE TO REQUEST FOR PRODUCTION NO. 94: a. This project replaced a portion of the equipment at Hells Canyon Complex ("HCC"), including governors, unit controls, and balance of plant ("BOP"). The IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 21 primary need for the project was related to the age of the equipment, which required increased maintenance and tuning. Upgrading the equipment will result in decreased frequency of required testing and maintenance, increased performance and unit efficiency, as well as better insight into plant conditions and operations. Please see the attachment provided in response to part (b) for a discussion of the consequences that would occur if the Company did not proceed with this project. b. Please see "Response to Request for Production No. 94(b) - Confidential Attachment - HCPR190001 Alternatives Analysis". c. Not applicable. Internal resources were utilized for this project. d. Please see the responses below. i. Please see "Response to Request for Production No. 94(d) - Attachment - HCPR190001 Project Plan". ii. Please see part (d)(i). iii. Please see part (d)(i). iv. Please see the Company's Response to Request for Production No. 17(a)(iv) for the project budget approval process. The creation of the HCPR Controls Modernization — Unit 3, Unit 1, BOP, Unit 2 (HCPR190001) project and corresponding approved budget amounts reflected in Response to Request for Production No. 94(f) — Confidential Attachment 1 - HCPR190001 Completion Budget to Actual is evidence of approval of the initial budget. e. Please see the responses below. i. Please see "Response to Request for Production No. 94(d) - Attachment - IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 22 HCPR190001 Project Plan.pdf". ii. Please see "Response to Request for Production No. 94(e) — Attachment 1 — HCPR190001 Baseline Construction WBS.pdf". iii. Please see "Response to Request for Production No. 94(e) — Attachment 1 — HCPR190001 Baseline Construction WBS.pdf". iv. Please see "Response to Request for Production No. 94 (e) — Attachment 2 — HCPR190001 Baseline Construction Variance Notes.pdf". V. Please see "Response to Request for Production No.94(e) —Attachment 3 - HCPR190001 Baseline Construction Monthly Summary.pdf" for the monthly summary report. Please see "Response to Request for Production No. 94(e) - Attachment 4 - HCPR190001 UNIT 1 Commissioning.zip", "Response to Request for Production No. 94(e) - Attachment 5 - HCPR190001 UNIT 2 Commissioning.zip", and "Response to Request for Production No. 94(e) - Attachment 6 - HCPR190001 BOP Commissioning.zip" for commissioning plans and action items. vi. Not applicable. No contractors were used with this project. f. Please see the responses below. i. Please see "Response to Request for Production No.94(f) — Confidential Attachment 1 - HCPR190001 Completion Budget to Actual.pdf'. ii. Please see "Response to Request for Production No.94(f) - Attachment 2 - HCPR190001 Completion Schedule to Actual.pdf". V. Not applicable. However, see the Variance Notes provided in part (e)(iv) for an explanation of variances driving the budget updates. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 23 vi. Please see "Response to Request for Production No.94(e) —Attachment 3 - HCPR190001 Baseline Construction Monthly Summary.pdf". The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 24 REQUEST FOR PRODUCTION NO. 95: Please provide the following information for the MLPR Units 1-2 AVR Upgrade (MLPR200001) project referenced by Secondary Supplemental Response to Production Request No. 5. Please include any available workpapers with formula intact. If any of the information requested below cannot be provided or is not available, please explain why it is not available or cannot be provided. a. Please provide a detailed explanation for the need of the project including the analysis justifying the need. b. Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. c. If a RFP or RFQ was submitted, please provide the following information: i. A copy of the RFP or RFQ that was submitted; ii. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; iii. The short-list bidder scorecard; and iv. A copy of the winning bid. d. Please provide the approved Initial Project Plan including the following: i. Initial project scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the Initial Project Plan and budget were approved at the appropriate level. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 25 e. Please provide the following for the Baseline Construction Project Plan including the following: i. Baseline project scope; ii. Baseline project budget broken down by the WBS; iii. Baseline project schedule broken down by the WBS; iv. If the baseline construction project scope, budget, and/or schedule deviated from the Initial Project Plan, please explain the differences, explain the reason for the change, and provide evidence that the changes were approved at the appropriate level; V. Project status reports and action items; and vi. Contractor change orders. f. Please provide the following related to completion of the project: i. Baseline construction budget-to-actual comparison by the WBS and by year; ii. Baseline construction schedule-to-actual comparison by the WBS; iii. For any budget-to-actual cost overages by major WBS category that is over 5%, please explain the reason for the differences and provide evidence that the amount was approved at the appropriate level; and iv. Please explain any deviations in schedule from the baseline construction schedule. RESPONSE TO REQUEST FOR PRODUCTION NO. 95: a. In the continued effort to standardize the excitation systems in Idaho Power's hydro fleet, the Milner automatic voltage regulators ("AVR") are among the last to be updated. The existing AVRs have had frequent equipment failures and are IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 26 becoming more expensive and difficult to maintain. Updated AVR equipment will standardize the units with other Idaho Power plants, reduce maintenance time, and mitigate potential failure of old equipment. In addition, updated AVR equipment will result in improved voltage response and performance. b. Please see "Response to Request for Production No. 95(b) — Confidential Attachment - MLPR200001 Alternatives Analysis.pdf". c. Please see the responses below. i. Please see "Response to Request for Production No. 95(c) - Attachment 1 - MLPR200001 Electrical Bid SOW.pdf" for the statement of work provided to bidders. ii. The statement of work was submitted to four vendors, but only one vendor bid the project. The Company compared the bid price to the price of internal wiring crews, and determined the prices were comparable. iii. Not applicable. The Company only received one bidder. iv. Idaho Power does not possess a copy of the bid. However, the signed statement of work (Request for Production No. 95(d)— Confidential Attachment 2 - MLPR200001 Contract SOW) utilized the contractor's schedule of rates, as shown in Exhibit A of the document, reflecting the terms of the winning bid." d. Please see the responses below. i. Please see Response to Request for Production No. 95(d) — Attachment 1 - MLPR200001 Project Plan and Response to Request for Production No. 95(d) — Confidential Attachment 2 - MLPR200001 Contract SOW. ii. Please see part (d)(i). IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 27 iii. Please see part (d)(i). iv. Please see the Company's Response to Request for Production No. 17(a)(iv) for the project budget approval process. The creation of the MLPR Units 1-2 AVR Upgrade Budget ID AFPR140005 and corresponding approved budget amounts reflected in Response to Request for Production No.95(f) — Confidential Attachment 1 - MLPR200001 Completion Budget to Actual is evidence of approval of the initial budget. e. Please see the responses below. i. Please see "Response to Request for Production No. 95(d) - Attachment - MLPR200001 Project Plan.pdf'. ii. Please see "Response to Request for Production No. 95(e) — Attachment 1 - MLPR200001 Baseline Construction WSB.pdf". iii. Please see "Response to Request for Production No. 95(e) - Attachment 1 - MLPR200001 Baseline Construction WSB.pdf". iv. Please see "Response to Request for Production No.95(e) - Attachment 2 - MLPR20001 Baseline Construction Variance Notes.pdf". V. Please see "Response to Request for Production No.95(e)(v) - Attachment 3 — MLPR200001 Baseline Construction Monthly Summary.pdf" for monthly summary reports. Please see in "Response to Request for Production No. 95(e) - Attachment 4 — MLPR200001 UNIT 1 Commissioning.zip" and "Response to Request for Production No. 95(e) - Attachment 5 — MLPR20001 UNIT 2 Commissioning.zip" for commissioning plans and action items. vi. Not applicable. There was not contractor change orders for this project. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 28 f. Please see the responses below. i. Please see "Response to Request for Production No.95(f) — Confidential Attachment 1 - MLPR200001 Completion Budget to Actual.pdf". ii. Please see "Response to Request for Production No.95(f) - Attachment 2 - MLPR200001 Completion Schedule to Actual.pdf". iii. Not applicable. However, see the Variance Notes provided in part (e)(iv) for an explanation of variances driving the budget updates. iv. Please see "Response to Request for Production No.95(e)(v) - Attachment 3 — MLPR200001 Baseline Construction Monthly Summary.pdf". The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 29 REQUEST FOR PRODUCTION NO. 96: Please provide the following information for the Grand View Sprinkler Conversion Capital Early Implementation (CHQB190001) project referenced by Secondary Supplemental Response to Production Request No. 5. Please include any available workpapers with formula intact. If any of the information requested below cannot be provided or is not available, please explain why it is not available or cannot be provided. a. Please provide a detailed explanation for the need of the project including the analysis justifying the need. b. Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. c. If a RFP or RFQ was submitted, please provide the following information: i. A copy of the RFP or RFQ that was submitted; ii. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; iii. The short-list bidder scorecard; and iv. A copy of the winning bid. d. Please provide the approved Initial Project Plan including the following: i. Initial project scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the Initial Project Plan and budget were approved at the IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 30 appropriate level. e. Please provide the following for the Baseline Construction Project Plan including the following: i. Baseline project scope; ii. Baseline project budget broken down by the WBS; iii. Baseline project schedule broken down by the WBS; iv. If the baseline construction project scope, budget, and/or schedule deviated from the Initial Project Plan, please explain the differences, explain the reason for the change, and provide evidence that the changes were approved at the appropriate level; V. Project status reports and action items; and vi. Contractor change orders. f. Please provide the following related to completion of the project: i. Baseline construction budget-to-actual comparison by the WBS and by year; ii. Baseline construction schedule-to-actual comparison by the WBS; iii. For any budget-to-actual cost overages by major WBS category that is over 5%, please explain the reason for the differences and provide evidence that the amount was approved at the appropriate level; and iv. Please explain any deviations in schedule from the baseline construction schedule. RESPONSE TO REQUEST FOR PRODUCTION NO. 96: a. The Grand View Sprinkler Conversion Capital Early Implementation (CHQB190001) program is included as a requirement of the Clean Water Act§401 IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER- 31 water quality certifications issued in 2019 by both the Oregon and Idaho Departments of Environmental Quality ("IDEQ" and "ODEQ"). In that certification, the program is referred to as the Grand View Sediment Reduction Program. The purpose of the Grand View Sediment Reduction Program is to reduce sediment run-off directly into the Snake River from agricultural drains created from flood irrigation practices. The program works with landowners to provide financial incentive to convert from flood irrigation to pressurized sprinkler systems. In the §401 water quality certifications, it is included as part of a phosphorous reduction program to improve oxygen conditions in Brownlee Reservoir. Measures included in the §401 water quality certifications are products of significant consultation between Idaho Power, IDEQ, ODEQ, and other agencies. Measures included in the final certifications are mandatory and are deemed by the state as necessary to comply with state water quality standards. In addition, the Federal Energy Regulatory Committee ("FERC") at minimum will include these measures as conditions of the new Hells Canyon Complex license relative to water quality. b. As outlined in part (a), this project is part of a Total Phosphorous reduction program developed in order to meet Idaho and Oregon state water quality standards. As a result, there were not alternatives explored for this project. c. An RFP or RFQ was not included in the implementation of the Grand View Sediment Reduction Program. The program is implemented by Idaho Power soliciting interest from landowners in the Grand View project area who have fields that meet the eligibility criteria established to convert from flood irrigation to IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 32 pressurized sprinkler irrigation in the area defined in the certification. A funding agreement is signed between Idaho Power and the landowner. It is the responsibility of the landowner to work with vendors to install the pressurized sprinkler system. d. Please see the responses below. i. The project scope was described in the application for §401 Water Quality Certification - Exhibit 7.2-8. Please see "Response to Production Request No. 96(d) — Attachment 1— Water Quality Certification.pdF. The Grand View Sediment Reduction Program assumes a 90% efficiency of the model estimated sediment reduction and targets 80% of the furrow-irrigated lands in the Grand View Irrigation District for conversion to sprinklers. Based on current landowner recruitment rate, the 80% goal is estimated to be achieved by 2040. ii. An initial project budget and schedule of$500,000 per year was determined to meet the goal of 80% conversion of furrow-irrigated lands in a reasonable trajectory of annual landowner recruitment toward the program goal. However, dollars spent within the year are variable and dependent upon landowner recruitment of projects to be completed within the calendar year. In some instances, based on the progression of recruitment, the dollar amount anticipated for the following year budget was known and approved budget dollars reflected the known amount. Deviations in baseline ($500,000 annual budget) are best explained by variability in landowner recruitment and the size of projects recruited. iii. Not applicable. It is the responsibility of the landowner to work with vendors to IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 33 install the pressurized sprinkler system. iv. Please see the Company's Response to Request for Production No. 17(a)(iv) for the project budget approval process. The creation of Grand View Sprinkler Conversion Capital Early Implementation (CHQB190001) and corresponding approved budget amounts reflected in the "Response to Request for Production No. 96(d) — Confidential Attachment 2 — Budget to Actuals.xlsx" is evidence of approval of the initial budget. e. Please see the responses below. i. Not applicable. See part (d)(iii). ii. Please see the "Response to Request for Production No. 96(d) —Confidential Attachment 2 - Budget to Actuals.xlsx" for the annual budget and actual dollars spent by WBS for the years 2019-present. iii. Not applicable. See part (d)(iii). iv. Program variances from the annual $500,000 budget are reflective of the size of the projects that were successfully recruited and implemented that year. V. Not applicable. See part (d)(iii). vi. Not applicable. See part (d)(iii). f. Please see the responses below. i. Please see "Response to Request for Production No. 96(d) — Confidential Attachment 2 - Budget to Actuals.xlsx" for the annual budget and actual dollars spent by WBS for the years 2019-present. ii. Not applicable. See part (d)(iii). iii. Please see part (e)(iv). IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 34 iv. Not applicable. See part (d)(iii). The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 35 REQUEST FOR PRODUCTION NO. 97: Please provide the following information for the HCC Rockfall Mitigation Program (OBSP180003) project referenced by Secondary Supplemental Response to Production Request No. 5. Please include any available workpapers with formula intact. If any of the information requested below cannot be provided or is not available, please explain why it is not available or cannot be provided. a. Please provide a detailed explanation for the need of the project including the analysis justifying the need. b. Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. c. If a RFP or RFQ was submitted, please provide the following information: i. A copy of the RFP or RFQ that was submitted; ii. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; iii. The short-list bidder scorecard; and iv. A copy of the winning bid. d. Please provide the approved Initial Project Plan including the following: i. Initial project scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the Initial Project Plan and budget were approved at the IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 36 appropriate level. e. Please provide the following for the Baseline Construction Project Plan including the following: i. Baseline project scope; ii. Baseline project budget broken down by the WBS; iii. Baseline project schedule broken down by the WBS; iv. If the baseline construction project scope, budget, and/or schedule deviated from the Initial Project Plan, please explain the differences, explain the reason for the change, and provide evidence that the changes were approved at the appropriate level; V. Project status reports and action items; and vi. Contractor change orders. f. Please provide the following related to completion of the project: i. Baseline construction budget-to-actual comparison by the WBS and by year; ii. Baseline construction schedule-to-actual comparison by the WBS; iii. For any budget-to-actual cost overages by major WBS category that is over 5%, please explain the reason for the differences and provide evidence that the amount was approved at the appropriate level; and iv. Please explain any deviations in schedule from the baseline construction schedule. RESPONSE TO REQUEST FOR PRODUCTION NO. 97: a. At the direction of legal counsel and in anticipation of litigation, a confidential engineering analysis was generated by an outside engineering firm ("Engineering IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 37 Analysis") that identified several sites with existing rock slopes along Hells Canyon Road between Oxbow, Oregon and the Hells Canyon Dam that, in the interests of public safety, would benefit from reinforcement to mitigate the risk of rockfall. The Engineering Analysis is strictly confidential and has not been provided due to risk of potential litigation and to preserve attorney-client privilege. Please contact Lead Counsel Lisa Nordstrom at (208) 388-5825 if further information is desired. b. This project was identified based on the Engineering Analysis and evaluated in comparison with other sites to be addressed in future years. Given the need to address public safety, there were no alternatives to completing this project. c. No RFP or RFQ was submitted for this specific project. Idaho Power determined it was in the best interest of the Company to single source this project based on the selected contractor's specific knowledge of the area and its successful completion of another competitively bid rockfall mitigation project the previous year that was also identified in the Engineering Analysis. Please see Response to Request for Production No. 97(c) —Attachment 1 — Single Source Contract Request. i. Not applicable. See part (c). ii. Not applicable. See part (c). iii. Not applicable. See part (c). iv. Please see Response to Request for Production No. 97(c) — Confidential Attachment 2 — Bid Proposal for a copy of the bid proposal. d. There is no specific project plan. However, the following provides more information related to the project: i. Please see Response to Request for Production No. 97(d) — Confidential IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 38 Attachment 1 — Design Package for the design package for site PP189, which contains the initial project scope and mitigation plan. ii. Please see Response to Request for Production No. 97(d) — Confidential Attachment 2 — Budget to Actuals for the project budget. iii. Please see Response to Request for Production No. 97(d) —Attachment 3 — 2023 Proposed Schedule and Response to Request for Production No. 97(d) —Attachment 4—2024 Proposed Schedule for the proposed project schedules. iv. Please see the Company's Response to Request for Production No. 17(a)(iv) for the project budget approval process. The creation of the BID OBSP180003 for the Rockfall Mitigation Program and corresponding approved budget amounts reflected in Response to Request for Production No. 97(d) — Confidential Attachment 2 — Budget to Actuals is evidence of approval of the initial budget. e. There is no construction project plan document as construction plans have not changed since the scope and design documents were created. i. Please see part (d)(i). This did not change from the initial project scope. ii. See the Company's Response to Request for Production No. 97(d)(ii). The project is not managed in MS Project Server therefore the only WBS the Company can provide for the project is reflective of the most recent budget and schedule. iii. See part (e)(ii). iv. Please see the Response to Request for Production No. 97(e) — Attachment 1 — Project Updates. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 39 V. Please see part (e)(iv). vi. Please see the Response to Request for Production No. 97(e) — Confidential Attachment 2 — Change Order and Response to Request for Production No. 97(e) — Confidential Attachment 3 — Change Order. f. Please see the responses below. i. Not applicable. See part (e)(ii). ii. Not applicable. See part (e)(ii). iii. The budget for 2024 is reflective of the entire year whereas actuals are through July 2024. Accordingly, the Company's budget to actuals analysis is focused on only 2023. Actual spend on labor was less than budget due to less internal oversite and project management labor required. Actual purchased services were higher than budget due to some unanticipated rock blasting work that was required to remove some hazard rocks that were not scalable with hand methods, as well as a mobilization fee for the work to re-commence and to mobilize blasting equipment. Also, the price for drilled dowels was adjusted slightly for inflation between work stop in 2023 and re-initiation in 2024. iv. Deviations from baseline schedule are common for this work. Often site conditions change, or aspects of the work vary in length from the estimated schedule. Because these are stand-alone projects without interdependencies, Idaho Power has flexibility to work with the contractor's schedule. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 40 REQUEST FOR PRODUCTION NO. 98: The Company's Second Supplemental Response to Staff Production Request No. 5 lists the following Transmission project: "T404200001 - T404 LNDN Convert Source From a Tap to a Loop Feed" for a total plant- in-service amount of $1,162,731 . Please provide the following information regarding this project: a. Please provide an explanation of the need for the project including the analysis justifying the need; b. Please list all potential alternatives the Company considered and explain why the Company selected this solution; c. Please provide the approved Initial Project Plan including the following: i. Initial project scope, including maps and/or drawings depicting the scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the plan and budget were approved at the appropriate level; and d. Please provide a comparison of the actual expenditures to the budget, by budget line item. RESPONSE TO REQUEST FOR PRODUCTION NO. 98: a. The Linden, Hill, and Skyway substations serve 22,736 customers and had an actual coincident summer 2022 peak load of 103 MW. With the addition of several new business projects and growth-related load transfers, the 2024 forecasted peak load of 147 MW will be served from the Caldwell to Nampa 138-kV Line#404 which serves the Linden, Hill, and Skyway substations. The Hill, Linden, and Skyway substation loads were at risk for extended outages. Industry best practices include IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 41 installing transmission breakers when the combined peak load is projected to exceed approximately 80 MW. Limiting the loss of load is most efficiently provided by installing 138-kV breakers at the Linden substation and extending the existing transmission line to the substation. Budget ID T404200001 is associated with the extension of the existing transmission line to the Linden substation and Budget ID LNDN190001, discussed in Response to Request for Production No. 99, is associated with the installation of the 138-kV breakers at the Linden substation. b. The following work was done to support local area load management and defer the T404200001 project until absolutely necessary: • A load transfer of 1.8 MW from the Linden substation to the Hill substation occurred in 2022, • A load transfer of 1.5 MW from the Linden substation to the Hill substation occurred in early 2024, • A load transfer of 4.0 MW from the Linden substation to the Vallivue substation occurred in 2023, and • A load transfer of 1 .15 MW from the Caldwell substation to the Linden substation occurred in early 2024. No additional alternatives would alleviate authorization of this project. c. A specific project plan could not be located. However, the following provides more information related to the project: i. The project scope included reconstructing the existing radial single circuit 138- kV transmission line as a double circuit 138-kV transmission line to route multiple transmission circuits into the existing Linden substation. The result IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 42 provides sources to Linden where new breakers would be installed to reduce loss of load on the Linden distribution feeders. New transmission line switches and dead-end steel structure will be required. To support communication needs, a fiber optic line overhead will be added on the distribution circuits. ii. The original budget, approved by executive management during the annual budget cycle in September 2021, was $439,000 with an expected completion date in May 2023. The anticipated schedule included scoping in 2021, design in 2022, and construction in 2023. A detailed schedule was not developed until after the project was approved and a project manager and design team were assigned. The schedule and cost prepared at the beginning of construction when the project was designed, can be found in Response to Request for Production No. 98 — Confidential Attachment 1. Note, the costs and schedule presented in the attachment are for the entire project Budget ID, which is inclusive of more work orders and work than what has been placed in service as of July 2024 and was presented in the Company's Second Supplemental Response to Staff Production Request No. 5. iii. See part ii above. iv. See the Company's Response to Request for Production No. 17(a)(iv) for an explanation of the capital project budget approval processes. The creation of Budget ID T404200001 for the reconstruction of the transmission line as well as the Customer Load and Research Information System ("CLRIS") screenshot provided as the Response to Request for Production No. 98 —Attachment 2, is evidence of approval of the initial budget. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 43 d. See Response to Request for Production No. 98—Confidential Attachment 3 which shows the forecasted project costs each quarter with supporting notes characterizing any variances. Note, the attachment includes information for the entire project Budget ID, which is inclusive of more work orders and work than what has been placed in service as of July 2024 and was presented in the Company's Second Supplemental Response to Staff Production Request No. 5. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 44 REQUEST FOR PRODUCTION NO. 99: The Company's Second Supplemental Response to Staff Production Request No. 5 lists the following Transmission project: "LNDN190001 - ADD 138KV BREAKERS" for a total plant-in-service amount of $3,954,411. Please provide the following information regarding this project: a. Please provide an explanation of the need for the project including the analysis justifying the need; b. Please list all potential alternatives the Company considered and explain why the Company selected this solution; c. Please provide the approved Initial Project Plan including the following: i. Initial project scope, including maps and/or drawings depicting the scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the plan and budget were approved at the appropriate level; and d. Please provide a comparison of the actual expenditures to the budget, by budget line item. RESPONSE TO REQUEST FOR PRODUCTION NO. 99: a. The Linden, Hill, and Skyway substations serve 22,736 customers and had an actual coincident summer 2022 peak load of 103 MW. With the addition of several new business projects and growth-related load transfers, the 2024 forecasted peak load of 147 MW will be served from the Caldwell to Nampa 138kV Line #404 which serves the Linden, Hill, and Skyway substations. The Hill, Linden, and Skyway loads were at risk for extended outages. Best practices include installing transmission breakers when the combined peak load is projected to exceed IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 45 approximately 80 MW. Limiting the loss of load is most efficiently provided by installing 138-kV breakers at the Linden substation and extending the existing transmission line to the substation. Budget ID LNDN190001 is associated with the installation of the 138-kV breakers at the Linden substation and Budget ID T40420001, discussed in the Response to Request for Production No. 98, is associated with the extension of the existing transmission line to the Linden substation. b. The following work was done to support local area load management and defer the LNDN190001 project until absolutely necessary: • A load transfer of 1.8 MW from the Linden substation to the Hill substation occurred in 2022, • A load transfer of 1.5 MW from the Linden substation to the Hill substation occurred in early 2024, • A load transfer of 4.0 MW from the Linden substation to the Vallivue substation occurred in 2023, and • A load transfer of 1 .15 MW from the Caldwell substation to the Linden substation occurred in early 2024. No additional alternatives would alleviate authorization of this project. c. A specific project plan could not be located. However, the following provides more information related to the project: i. The project scope included the following: • Installing new 138-kV breakers at Linden to break up the existing 138- kV Line #404. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 46 • Feeder relay replacements for Linden 011A, 013A, 015A, 017A and replacement of T132 with a larger (44.8 MVA) transformer. The feeder relay replacements entail removal of the 1999 vintage SEL-251 relays installed in the metalclad #2 feeder bay door panels for Linden 011A, 013A, 015A, and 017A, as well as removal of the feeder control panel in metalclad #2. • Installing two new CF9 (125V Direct Current) dual feeder panels in the Linden control building with SEL-351A primary and backup relays. • Installing new cables from the feeder metalclad bays to the new dual feeder panels. • For Supervisory Control and Data Acquisition ("SCADA") upgrades, an SEL-2032 or a Real Time Automation Controller may be needed. SCADA should include, at a minimum, the following points for distribution operation: Feeder level = 3-phase MW, ground amps, by- phase amps, and by-phase VARs and voltage. ii. The original budget, approved by executive management during the annual budget cycle in September 2021, was $1,948,000 with an expected completion date in May 2023. The anticipated schedule included scoping in 2021, design in 2022, and construction in 2023. A detailed schedule was not developed until after the project was approved and a project manager and design team were assigned. The schedule and cost prepared at the beginning of construction when the project was designed, can be found in the Response to Request for Production No. 99 — Confidential Attachment 1. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 47 iii. See part ii above. iv. See the Company's Response to Request for Production No. 17(a)(iv) for an explanation of the capital project budget approval processes. The creation of Budget ID LNDN190001 for the installation of the 138-kV breakers as well as the CLRIS screenshot provided as the Response to Request for Production No. 99 —Attachment 2 is evidence of approval of the initial budget. d. See Response to Request for Production No. 99—Confidential Attachment 3 which shows the forecasted project costs each quarter with supporting notes characterizing any variances. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 48 REQUEST FOR PRODUCTION NO. 100: The Company's Second Supplemental Response to Staff Production Request No. 5 lists the following Transmission project: "T409210001 - 10-YEAR INSPECTION REPAIRS, BRADY-FREMONT-KINPORT" for a total plant-in-service amount of $1,383,573. Please provide the following information regarding this project: a. Please provide an explanation of the need for the project including the analysis justifying the need; b. Please list all potential alternatives the Company considered and explain why the Company selected this solution; c. Please provide the approved Initial Project Plan including the following: i. Initial project scope, including maps and/or drawings depicting the scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the plan and budget were approved at the appropriate level; and d. Please provide a comparison of the actual expenditures to the budget, by budget line item. RESPONSE TO REQUEST FOR PRODUCTION NO. 100: a. This project was needed to correct issues on the Brady-Fremont-Kinport line identified during detailed aerial inspection, ground line inspection, and outstanding Priority 2 and 3 defects identified by patrolman. Line #409 was originally built in 1943. The 10-year maintenance plan for this line began in 2022 with the pole inspection and groundline treatment, followed by design in 2023 and construction in 2024. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 49 b. When defects on existing lines are identified, repairs must be implemented to correct those defects. There are no other alternatives available. c. A specific project plan could not be located. However, the following provides more information related to the project: i. The project scope included repairing or replacing deteriorated poles, crossarms, and insulators identified during the pole inspection and ground line treatment program and the annual routine line patrols. After inspection and preparation of the corrective action plan, 58 defects were found requiring replacement of insulators, crossarms, and poles. ii. The original budget, approved by executive management during the annual budget cycle in September 2021, of $531,000 was a high-level estimate because the inspection was to be conducted the following year (2022) with an expected completion date in December 2024. The budget was subsequently updated once the inspection and corrective action plan were complete. The updated estimate of $1,190,000 was set in July 2023 and reviewed and approved by the Company's executive management. The anticipated original schedule included scoping in 2022, design in 2023, and construction in 2024. A detailed schedule was not developed until after the project was approved and a project manager and design team were assigned. The schedule and cost estimate prepared at the beginning of construction after the project was designed, can be found in Response to Request for Production No. 100 — Confidential Attachment 1. iii. See part ii above. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 50 iv. See the Company's Response to Request for Production No. 17(a)(iv) for an explanation of the capital project budget approval processes. The creation of Budget ID T409210001 for the work on Line #409 as well as the CLRIS screenshot provided as Response to Request for Production No. 100 — Attachment 2 is evidence of approval of the initial budget. d. See Response to Request for Production No. 100 —Confidential Attachment 3 which shows the forecasted project costs each quarter with supporting notes characterizing any variances. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 51 REQUEST FOR PRODUCTION NO. 101: The Company's Second Supplemental Response to Staff Production Request No. 5 lists the following Transmission project: "GINT240629 - INTERCONNECT FOR 36 MW BESS AT HMWY" for a total plant-in- service amount of $782,813. Please provide the following information regarding this project: a. Please provide an explanation of the need for the project including the analysis justifying the need; b. Please list all potential alternatives the Company considered and explain why the Company selected this solution; c. Please provide the approved Initial Project Plan including the following: i. Initial project scope, including maps and/or drawings depicting the scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the plan and budget were approved at the appropriate level; and d. Please provide a comparison of the actual expenditures to the budget, by budget line item. RESPONSE TO REQUEST FOR PRODUCTION NO. 101: a. Budget ID GINT240629 was associated with Idaho Power's interconnection request to support the 36 MW Hemingway Battery Energy Storage System ("BESS") project, the resource for which the Company received a Certificate of Public Convenience and Necessity'. The applicant, Idaho Power Power Supply, is identified by queue number 629 in the Company's Generation Interconnection Case No. IPC-E-23-05, Certificate No. 544 and Case No. IPC-E-23-20, Certificate No. 547. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 52 Queue. The application for the Hemingway Energy Storage 2 was made in January 2022 for a total size of up to 85 MW at the point of interconnection and a Generator Interconnection Agreement ("GIA") was executed in January 2023 and provided notice to proceed in October 2023. The upgrades described in the GIA are required to interconnect the 36 MW Hemingway BESS project in 2024. b. Idaho Power must comply with the GIA provisions under the Company's Open Access Transmission Tariff ("OATT") to accommodate interconnection requests therefore there are no feasible alternatives to this project. c. There is no specific project plan for GIA projects because the scope of work is included in the GIA. However, the following provides more information related to the project: i. See the Response to Request for Production No. 101 — Confidential Attachment 1 which includes the GIA (and amendments) inclusive of the scope of work for this project. ii. The GIA provided as Response to Request for Production No. 101 — Confidential Attachment 1 includes the initial estimated costs. iii. The GIA provided as Response to Request for Production No. 101 — Confidential Attachment 1 includes the initial proposed schedule. iv. Upon unsuspension of the GIA in October 2023, Idaho Power immediately began executing the required interconnection facilities design and construction of the project. The schedule and cost estimate prepared at the beginning of construction after the project was designed, can be found in Response to Request for Production No. 101 — Confidential Attachment 2. Because IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 53 interconnection facilities are required under the Company's GATT, there is no approval of the scope, budget or schedule as part of the capital budgeting process. d. See Response to Request for Production No. 101 — Attachment 3. The response to this Request is sponsored by Eric Hackett, Projects and Resource Development Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 54 REQUEST FOR PRODUCTION NO. 102: The Company's Second Supplemental Response to Staff Production Request No. 5 lists the following Transmission project: "T215210001 10-year inspection repairs, Ontario-Weiser 69kV" for a total plant-in-service amount of $1,073,384. Please provide the following information regarding this project: a. Please provide an explanation of the need for the project including the analysis justifying the need; b. Please list all potential alternatives the Company considered and explain why the Company selected this solution; c. Please provide the approved Initial Project Plan including the following: i. Initial project scope, including maps and/or drawings depicting the scope; ii. Initial project budget; iii. Initial proposed schedule; and iv. Evidence that the plan and budget were approved at the appropriate level; and d. Please provide a comparison of the actual expenditures to the budget, by budget line item. RESPONSE TO REQUEST FOR PRODUCTION NO. 102: a. This project was needed to correct issues on the Ontario-Weiser 69-kV line identified during detailed aerial inspection, ground line inspection, and outstanding Priority 2 and 3 defects identified by patrolman. Line #215 was originally built in 1950. The 10-year maintenance plan for this line began in 2022 with the pole inspection and groundline treatment, followed by design in 2023 and construction in 2024. b. When defects on existing lines are identified, repairs must be implemented to IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 55 correct those defects. There are no other alternatives available. c. A specific project plan could not be located. However, the following provides more information related to the project: i. The project scope included repairing or replacing deteriorated poles, crossarms, and insulators identified during the pole inspection and ground line treatment program and the annual routine line patrols. After inspection and preparation of the corrective action plan, 114 defects were found requiring either the replacement of poles or the addition of wood stubs to support existing poles. ii. The original budget, approved by executive management during the annual budget cycle in September 2021, of $270,000 was a high-level estimate because the inspection was to be conducted the following year (2022) with an expected completion date in December 2024. The budget was subsequently updated once the inspection and corrective action plan were complete. The updated estimate of $1,115,000 was set in July 2023 and reviewed and approved by the Company's executive management. The anticipated original schedule included scoping in 2022, design in 2023, and construction in 2024. A detailed schedule was not developed until after the project was approved and a project manager and design team were assigned. The schedule and cost estimate prepared at the beginning of construction after the project was designed, can be found in Response to Request for Production No. 102 — Confidential Attachment 1. iii. See part ii above. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 56 iv. See the Company's Response to Request for Production No. 17(a)(iv) for an explanation of the capital project budget approval processes. The creation of Budget ID T215210001 for the work on Line #215 as well as the CLRIS screenshot provided as Response to Request for Production No. 102 — Attachment 2 is evidence of approval of the initial budget. d. See Response to Request for Production No. 102 — Confidential Attachment 3 which shows the forecasted project costs each quarter with supporting notes characterizing any variances. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 57 REQUEST FOR PRODUCTION NO. 103: The Company's response to Staff Production Request No. 20 included several attachments in which the total Transmission Line 423 project budget and completion date is different from the costs and dates identified in Colburn's Direct at 6. Please answer the following: a. Please provide actual spend to date by year and total in-service expenditures by year for this project. b. Please explain if any of this project was recovered in the previous rate case. If so, please provide the amount that was recovered. c. Please identify the total cost of the project that the Company is seeking recovery of this project in this rate case. d. Please reconcile the project budget from the following: i. Colburn Direct at 6: $15 million; ii. Response to Request No. 20(e) -Variance Notes: $29,150,509; iii. Response to Request No. 20(e) — WBS: $29,323,195; and iv. Response to Request No. 17(a) — Confidential Attachment 2: e. Please identify each component of the budget to include each winning RFP bids, materials, AFUDC, etc. Additionally, please identify the updated costs of construction, design, steel poles, labor, etc. from the latest Change Orders. f. Please reconcile the following two expected project completion dates with Colburn's testimony of October 2024: i. Response to 20(e) — Attachment 1 WBS: 1/17/25; and ii. Response to 20(c) - Confidential Attachment 12- Construction Winning Bid — Schedule: _. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 58 RESPONSE TO REQUEST FOR PRODUCTION NO. 103: a. Please see the Response to Request No. 17(a) Confidential Attachment 2, the Budget Update — Authorized to Spend file, for actuals through June 30, 2024. No work orders associated with this Budget ID have been placed in service in 2024 yet. b. Two work orders associated with this Budget ID have been placed in service prior to 2024, WO 27601981 was placed in service in 2022 for $14,854 and WO 27567260 for$93,471. However, these amounts are not a part of the $14.98 million in project costs requested in this case. c. See Larkin Workpaper 3. Idaho Power is seeking recovery of project costs of $14.98 million in this case. Note, the project costs included in the Company's request in this case are associated with only one work order though the entire project Budget ID is inclusive of multiple work orders. d. The following is a reconciliation of the project amounts presented in various documents: i. Colburn Direct at 6: $15 million; This amount references the 2024 Wildfire Mitigation Plan which reflects the rounded version of project costs presented in Larkin's Workpaper 3. ii. Response to Request No. 20(e) - Variance Notes: $29,150,509; See part (c) above. The Variance Notes include project costs associated with the Budget ID, which is inclusive of multiple work orders, including the one associated with the amounts presented in Larkin Workpaper 3. Because the project is managed in MS Project Server at the Budget ID level, Idaho Power is unable to provide IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 59 notes specific to just the one work order. iii. Response to Request No. 20(e) — WBS: $29,323,195; See part (d)(ii) above. The WBS includes costs associated with the entire Budget ID. iv. Response to Request No. 17(a)—Confidential Attachment 2: This is the sum of the original approved annual budget amounts. Recall, throughout the year projects are evaluated and re-forecasted as necessary to increase or reduce forecasted spend during the remaining life of the project. However, these updated forecasts are not retroactively used to adjust the approved budget for that year, the original approved budget for that year stays as originally approved. Therefore, summing the original approved annual budget amounts is not an accurate reflection of the approved budget in totality. e. The Variance Notes provided as the Response to Request for Production No. 20(e) — Attachment 2 show the first budget established was $15,601,701 with 2019 Recast 3. However, the level of budget detail requested was not available until the 2022 Recast 3, performed in July 2022. The following chart summarizes the 2022 Recast 3 budget of $26,420,797, by component. It also includes the budget by component for each subsequent budget update as well as actual project costs by component as of August 23, 2024. Note, AFUDC is not included in budget estimates as it is not tracked in MS Project Server, therefore the actual costs to date presented below also do not include AFUDC. Category Budget Budget Budget Budget Actual Cost Jul 2022 Apr 2023 Jan 2024 Apr 2024 To Date Labor $723,181 $923,440 $443,835 $459,561 _ Materials $10,537,400 $10,414,272 $12,330,441 $12,829,743 - Purchased Services $15,065,506 $15,205,125 $14,726,855 $15,578,627 - IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 60 Other Expenses $94,709 $97,860 $203,361 $282,577 _ Total $26,420,797 $26,640,697 $27,704,492 $29,150,509 - f. The following is a reconciliation of two expected project completion dates provided in prior data responses with the project completion date of October 2024 in Mr. Colburn's testimony. Please note, the scheduled in-service date has been moved out from October 2024 to December 2024 since submittal of Colburn's testimony. i. Response to 20(e) — Attachment 1 WBS: 1/17/25 — Because the Company anticipates the final payment of approximately $23k for construction support services to be made in January 2025, following the in-service date of the project, the WBS shows a completion of all activity on January 17, 2025. ii. Response to 20(c) - Confidential Attachment 12- Construction Winning Bid — Schedule: — This reflects the forecasted in-service date at the time the winning bid was submitted, April 2024. While the Company initially anticipated an in-service date in October 2024, it now appears the in-service date will align more with the winning bid estimate. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 61 REQUEST FOR PRODUCTION NO. 104: The Company's response to Staff Production Request No. 21 included several attachments in which the total Transmission Line 902 project budget and completion date is different from the costs and dates identified in Colburn's Direct at 9. Please answer the following: a. Please provide actual spend to date by year and total in-service expenditures by year for this project in excel format. b. Please explain if any of this project was recovered in the previous rate case. If so, please provide the amount that was included as recovered. c. Please identify the total cost that the Company is seeking recovery of this project in this rate case. d. Please reconcile the project budget from the following: i. Colburn Direct at 9: $21.2 million; ii. Response to Request No. 20(e) -Variance Notes: $20,514,727; and iii. Response to Request No. 17(a) Confidential Attachment 2: e. Please identify each component of the budget to include each winning RFP bids, materials, AFUDC, etc. Additionally, please identify the updated costs of construction, design, steel poles, labor, etc. from the latest Change Orders. f. Please reconcile the following two expected project completion dates with Colburn's testimony of December 2024: i. Response to 20(e) —Attachment 1- WBS: 12/29/26; and ii. Response to 20(c) - Confidential Attachment 6- Winning Bid — MPE Construction Schedule:M. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 62 RESPONSE TO REQUEST FOR PRODUCTION NO. 104: a. Please see the Response to Request No. 17(a) — Confidential Attachment 2, the Budget Update—Authorized to Spend file, that includes actual spend through June 30, 2024. No work orders associated with this Budget ID have been placed in service in 2024 yet. b. There were no costs associated with the project included in the 2023 general rate case test year. c. See Larkin Workpaper 3. Idaho Power is seeking recovery of project costs of $21.17 million in this case. d. The following is a reconciliation of the project amounts presented in various documents: i. Colburn Direct at 9: $21.2 million: This amount reflects the rounded version of project costs presented in Larkin's Workpaper 3. ii. Response to Request No. 21(e) - Variance Notes: $20,514,727: This amount reflects the budget estimate as of April 2024. iii. Response to Request No. 17(a) Confidential Attachment 2: This is the sum of the original approved annual budget amounts. Recall, throughout the year projects are evaluated and re-forecasted as necessary to increase or reduce forecasted spend during the remaining life of the project. However, these updated forecasts are not retroactively used to adjust the approved budget for that year, the original approved budget for that year stays as originally approved. Therefore, summing the original approved annual budget amounts is not an accurate reflection of the approved budget in totality. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 63 e. The following chart summarizes the initial budget of $21,807,340 as presented in the Variance Notes provided as the Response to Request 21(e) — Attachment 2, by component. It also includes the budget by component for each subsequent budget update as well as actual project costs by component as of August 23, 2024. Note, AFUDC is not included in budget estimates as it is not tracked in MS Project Server, therefore the actual costs to date presented below also do not include AFUDC. Category Budget Budget Budget Actual Cost Apr 2023 Jan 2024 Apr 2024 To Date Labor $82,340 $89,715 $51,055 _ Materials $11,400,000 $12,449,053 $12,365,340 Purchased Services $10,325,000 $6,810,020 $8,060,420 Other Expenses $14,521 $37,913 _ Total $21,807,340 $19,273,594 $20,463,672 f. The following is a reconciliation of two expected project completion dates provided in prior data responses with the project completion date of December 2024 in Mr. Colburn's testimony: i. Response to 21(e) —Attachment 1- WBS: 12/29/26: Idaho Power identified an error in the completion date presented in the WBS provided in the Response to Request for Production No. 21(e) — Attachment 1. The project completion date for the Rattlesnake to DRAM portion of the line is December 13, 2024. Please see the Supplemental Response to Request No. 21(e) — Attachment 1 for the corrected WBS. ii. Response to 21(c) - Confidential Attachment 6 - Winning Bid — MPE Construction Schedule: 5/31/24: Upon investigation, it was determined that the winning bid provided as the Company's Response to 21(c) — Confidential IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 64 Attachment 6 was not the winning bid for this phase of the project. Please see the Supplemental Response to Request No. 21(c) — Confidential Attachment 1 for the correct MPE winning bid. Note, the preliminary construction schedule identified a final completion of December 2024. It was also discovered the RFP and the bid evaluation provided for the construction services was associated with a different phase of the project. Please see the Supplemental Response to Request No. 21(c) —Attachment 2 for the correct RFP for construction services and Supplemental Response to Request No. 21(c) — Confidential Attachment 3 for the correct construction services bid evaluation. The response to this Request is sponsored by Mitch Colburn, Vice President of Planning, Engineering, and Construction, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 65 REQUEST FOR PRODUCTION NO. 105: Please provide copies of all invoices and other supporting documentation, such as contracts, incentive requests, approvals, and calculations for the expenses listed on "Capital Project Data Request June 2024 pt 2" (Confidential Attachment No. 1). Please also provide the following data in Excel format for each individual expense for the projects: a. Invoice date; b. Invoice number; c. Invoice amount; and d. Invoice purpose (Services performed and/or materials purchased, etc.). RESPONSE TO REQUEST FOR PRODUCTION NO. 105: Please see Response to Request for Production No. 105 - Confidential Attachments 1 through 11 providing supporting documentation for the expenses selected in Staff's sample, "Capital Project Data Request June 2024 pt 2" (Confidential Attachment No. 1). The response to this Request is sponsored by Matthew Larkin, Revenue Requirement Senior Manager, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 66 DATED at Boise, Idaho, this 9t" day of September 2024. LISA D. NORDSTROM Attorney for Idaho Power Company DONOVAN E. WALKER Attorney for Idaho Power Company MEGAN GOICOECHEA ALLEN Attorney for Idaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 67 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 9t" day of September 2024, 1 served a true and correct copy of Idaho Power Company's Response to the Twelfth Production Request of the Commission Staff to Idaho Power upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Hand Delivered Chris Burdin U.S. Mail Deputy Attorney General Overnight Mail Idaho Public Utilities Commission FAX 11331 W. Chinden Blvd., Bldg No. 8 FTP Site Suite 201-A (83714) X Email Chris.Burdin(c�puc.idaho.gov PO Box 83720 Boise, ID 83720-0074 Industrial Customers of Idaho Power Hand Delivered Peter J. Richardson U.S. Mail Richardson Adams, PLLC Overnight Mail 515 N. 27' Street FAX Boise, Idaho 83702 FTP Site X Email peterC@richardsonadams.com Dr. Don Reading Hand Delivered 280 Silverwood Way U.S. Mail Eagle, Idaho 83616 Overnight Mail FAX FTP Site X Email dreading(@mindspring.com Idaho Irrigation Pumpers Association, Hand Delivered Inc. U.S. Mail Eric L. Olsen Overnight Mail ECHO HAWK & OLSEN, PLLC FAX 505 Pershing Avenue, Suite 100 FTP Site P.O. Box 6119 X Email elo _echohawk.com Pocatello, Idaho 83205 Lance Kaufman, Ph.D. Hand Delivered 2623 NW Bluebell Place U.S. Mail Corvallis, OR 97330 Overnight Mail FAX FTP Site X Email lance aegisinsight.com IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 68 Idaho Conservation League Hand Delivered Brad Heusinkveld U.S. Mail 710 N. 6t" Street Overnight Mail Boise, Idaho 83702 FAX FTP Site X Email bheusinkveld(aD.idahoconservation.org Brad Heusinkveld Hand Delivered Idaho Conservation League U.S. Mail 710 N. 6t" Street Overnight Mail Boise, Idaho 83702 FAX FTP Site X Email bheusinkveld(a-).idahoconservation.org Micron Technology, Inc. Hand Delivered Austin Rueschhoff U.S. Mail Thorvald A. Nelson Overnight Mail Austin W. Jensen FAX Kristine A.K. Roach FTP Site Holland & Hart LLP X Email 555 17' Street, Suite 3200 darueschhoff(a-)hollandhart.com Denver, CO 80202 tnelson hollandhart.com awiensen(a)hollandhart.com karoach(a�hol land hart.com aclee hol land hart.com mamcmillen(a)hollandhart.com Jim Swier Hand Delivered Micron Technology, Inc. U.S. Mail 8000 South Federal Way Overnight Mail Boise, ID 83707 FAX FTP Site X Email swierC@_micron.com City of Boise Hand Delivered Ed Jewell U.S. Mail Deputy City Attorney Overnight Mail Boise City Attorney's Office FAX 150 N. Capitol Blvd. FTP Site P.O. Box 500 X Email Boise, Idaho 83701 BoiseCityAttorney_(a)cityofboise.org eiewell(a-)-cityofboise.org IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 69 Steven Hubble Hand Delivered Boise City Dept. of Public Works U.S. Mail 150 N. Capitol Blvd. Overnight Mail P.O. Box 500 FAX Boise, Idaho 83701-0500 FTP Site X Email sh u bbleCcDcityofboise.org Federal Executive Agencies Hand Delivered Peter Meier U.S. Mail Emily W. Medlyn Overnight Mail U.S. Department of Energy FAX 1000 Independence Ave., S.W. FTP Site Washington, DC 20585 X Email Pete r.meier(o-)hg.doe.gov emily.medlyn(a-),hg.doe.gov Stacy Gust, Regulatory Administrative Assistant IDAHO POWER COMPANY'S RESPONSE TO THE TWELFTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER - 70