Loading...
HomeMy WebLinkAboutIntermountain Gas 3 Jun Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins Date(s): 3-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:FI Construction:� Training: F—] (T)(D)Integrity Management: F-1 Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 3 June 2020: (.8 Construction, .2 typed report) Observed a Das-co crew installing a new W service line inside a 2" PE pipe being used as a sleeve because of rocky ground at 3800 Airport Rd in Nampa, Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, boring, bedding, EFV installation, service line install and pressure testing. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): Date: Bruce Perkins 6/3/2020 Reviewer: Date: Darrin Ulmer q IPUC Form 1