HomeMy WebLinkAboutIntermountain Gas 2 Jun Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 2-Jun-20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
StandardT—1 Construction:FTI Training: F7 (T)(D) Integrity Management: El Incident: E]
M/M: F-1 Follow-up: F-1 OQ: F7 Damage Prevention: El D&A: E]
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
2 June 2020: (.8 Construction, .2 typed report)
Observed a Das-co crew abandoning a 1/2" service and installing a new%" service tee and service line at 2373 N
Pleasant Hill Way in Boise, Idaho.All procedures were followed.Typed up report
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF 71 by(date):
Inspector (Lead): Date:
Bruce Perkins "" 6/2/2020
Reviewer: Date:
Darrin Ulmer ,/;dam '-VZd
IPUC Form 1