Loading...
HomeMy WebLinkAboutIntermountain Gas 2 Jun Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 2-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 StandardT—1 Construction:FTI Training: F7 (T)(D) Integrity Management: El Incident: E] M/M: F-1 Follow-up: F-1 OQ: F7 Damage Prevention: El D&A: E] Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 2 June 2020: (.8 Construction, .2 typed report) Observed a Das-co crew abandoning a 1/2" service and installing a new%" service tee and service line at 2373 N Pleasant Hill Way in Boise, Idaho.All procedures were followed.Typed up report Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes NoF 71 by(date): Inspector (Lead): Date: Bruce Perkins "" 6/2/2020 Reviewer: Date: Darrin Ulmer ,/;dam '-VZd IPUC Form 1