Loading...
HomeMy WebLinkAboutIntermountain Gas 2 Jan Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo/ Perkins Date(s): 2-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 2 Standard: Construction: F2 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 02 Jan 2020: (1.0 Construction) Observed a Dasco crew installing a new service with an EFV. They used proper bedding and shading procedures and left a stub and stub marker for the future property next door. Pressure tested the service and tied it in. Typed up report Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X YesF71 No 71 by (date): Inspector(Lead): Date: Kyle Russo — 1/2/2020 Reviewer: Date: U :34,zo;zc' IPUC Form 1