HomeMy WebLinkAboutIntermountain Gas 2 Jan Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo/ Perkins Date(s): 2-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 2
Standard: Construction: F2 Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
02 Jan 2020: (1.0 Construction)
Observed a Dasco crew installing a new service with an EFV. They used proper bedding and shading
procedures and left a stub and stub marker for the future property next door. Pressure tested the service
and tied it in. Typed up report
Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
YesF71 No 71 by (date):
Inspector(Lead): Date:
Kyle Russo — 1/2/2020
Reviewer: Date:
U :34,zo;zc'
IPUC Form 1