Loading...
HomeMy WebLinkAboutIntermountain Gas 1 Jun Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 1-Jun-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:71 Construction:FTI Training: F__] (T)(D) Integrity Management: F7 Incident: El M/M: F-1 Follow-up: F-1 oQ: F-1 Damage Prevention: F-1 D&A: Inspection Summary A construction inspection was performed on Track, a contractor for Intermountain Gas Company. 1 June 2020: (.5 Construction, .5 typed report) Observed a Track crew Installing new W service tees and stubs and fusing 2" main, in New York Landing Subdivision, Happy Valley Rd/Alma Rd in Nampa, Idaho. All procedures were followed. Typed up report Attachments: IPUC Form 4 Construction Inspections Track Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins 6/1/2020 Reviewer: Date: Darrin Ulmer -eczb IPUC Form 1