Loading...
HomeMy WebLinkAboutIntermountain Gas Twin Falls Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer I Date(s): 18-20 Feb 2020 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 3 Standard:F-1 Construction: F-1 Training: r3 (T)(D) Integrity Management: El Incident: F7 M/M: F-1 Follow-up: F-1 OQ: F-1 Damage Prevention: D&A: Inspection Summary Inspector attended IGC's Plastic Pipe Joining Training in the Twin Falls District in Jerome, Idaho. 18 Feb 2020: (1 Training) Traveled to Twin Falls for training. 19 Feb 2020 (1 Training) Inspector observed IGC employees/contractors (KV&Track) classroom trained, written test and hands on by Justin Wilhelm and Josh Shell on Plastic Pipe Joining: subjects covered were Met Fits, Electro Fusion, Stab Fittings, Butt Fusion and Cutting,Testing Butt Fusion, Electro Fusion joints, cad welding and pipe wrapping. 20 Feb 2020 (1 Training) Inspector observed a few contractors re-eval on butt fusions. Traveled back to Boise and typed report Attachments: Sign-in sheets for the IGC training classes Slide show presentation located in file Corrective Action Required: Follow- Required: Yes No X Yes No X by (date): Inspector (Lead): Date: f; rJOCi Reviewer: Date: IPUC Form 1