Inspector(s): I Ulmer I Date(s): 18-20 Feb 2020
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 3
Standard:F-1 Construction: F-1 Training: r3 (T)(D) Integrity Management: El Incident: F7
M/M: F-1 Follow-up: F-1 OQ: F-1 Damage Prevention: D&A:
Inspection Summary
Inspector attended IGC's Plastic Pipe Joining Training in the Twin Falls District in Jerome, Idaho.
18 Feb 2020: (1 Training)
Traveled to Twin Falls for training.
19 Feb 2020 (1 Training)
Inspector observed IGC employees/contractors (KV&Track) classroom trained, written test and hands on by
Justin Wilhelm and Josh Shell on Plastic Pipe Joining: subjects covered were Met Fits, Electro Fusion, Stab
Fittings, Butt Fusion and Cutting,Testing Butt Fusion, Electro Fusion joints, cad welding and pipe wrapping.
20 Feb 2020 (1 Training)
Inspector observed a few contractors re-eval on butt fusions. Traveled back to Boise and typed report
Attachments:
Sign-in sheets for the IGC training classes
Slide show presentation located in file
Corrective Action Required: Follow- Required: Yes No X
Yes No X by (date):
Inspector (Lead): Date:
f; rJOCi
Reviewer: Date:
IPUC Form 1