HomeMy WebLinkAboutIntermountain Gas TIMP Idaho PUC Pipeline Safety Inspection Summary
IC
nspector(s): Ulmer Date(s): 11/3-4/2020
ompany/Owner: Intermountain Gas Company Unit/OPID: TIMP/8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 5
Standard: Construction: Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting Intermountain Gas Company's Transmission Integrity Management Plan (TIMP)
against PHMSA IA question set,49 CFR Part 192. This audit was performed virtually through Microsoft
Teams. The Transmission Integrity Management Plan was audited by all inspectors and will submit audit
reports,forms and letters as required by their state.
Oct 30-Nov 2, 2020: (2 TIMP Prep)
Prepared for the Transmission Integrity Plan Audit of Intermountain Gas Company. Reviewed PHMSA Guidance
Manual, Company TIMP plan and prepared PHMSA IA question set for the audit.
November 3-4,2020: (2 TIMP)
Darrin Ulmer of the Idaho Public Utilities Commission met virtually with Intermountain Gas Company personnel:
Kelley Gorringe, David Gutschmidt and the MDU Gas Integrity Engineering Group (Jesse Volk,Jamie Walter,
Kyara Diaz,James Kristofer and Nathan Sundt) to conduct an audit of the company's TIMP. The PHMSA
Inspector Assistant Program was used to conduct the audit. No issues or concerns were identified during the
inspection. An IPUC Form 3 (exit interview) was performed following the inspection with Kelley Gorringe
(Compliance/Audit Specialist).
November 5, 2020: (1 TIMP Post)
Completed forms and typed report.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
Misc. Operator Forms
Corrective Action Required: Yes No X
Follow-up Required: y(date): Yes No X
Inspector(Lead): Date:
Reviewer: Date:
IPUC Form 1