Loading...
HomeMy WebLinkAboutIntermountain Gas Pocatello Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 11-13 Feb 2020 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 3 StandardT-1 Construction: 51-1 Training: F3 (T)(D) Integrity Management: El Incident: M/M: F7 Follow-up: F� OQ: F-1 Damage Prevention: F-1 D&A: Inspection Summary A construction inspection was performed on a KV Utilities crew at 1284/1288 Wright Ave in Pocatello, Idaho 11 Feb 2020: (1.0 Construction) Observed a KV Utilities crew locating/exposing a 2" main and installing saddle tee, then boring under Wright Ave, trenching, installing a tee, EFV's, service lines to both houses, installing risers, installing meter bars, pressure testing and backfilling. A training program inspection was performed on IGC personnel at the Pocatello, Idaho office 12-13 Feb 2020 (2 Training) On 12 Feb I observed IGC gas crews being classroom trained, written test and hands on by Justin Wilhelm and Jake Robinson on Met Fits, Electro Fusion, Stab Fittings, Butt Fusion and Cutting,Testing Butt Fusion and Electro Fusion joints. On 13 Feb I observed IGC Service Techs being classroom trained, written test and hands on by Justin Wilhelm and Jake Robinson on Met Fits and Stab Fittings. Typed report Attachments: IPUC Form 4 Construction Inspections Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Itineraries for the IGC training classes Corrective Action Required: Follow-up Required: Yes No X Yes No al by (date): Inspector (Lead): %' Date: Bruce Perkins <</ 2/13/2020 Reviewer: Date: IPUC Form 1