HomeMy WebLinkAboutIntermountain Gas Boise Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Ulmer Date(s): Jun 15-18, 202 Company/Owner: Intermountain Gas Company Unit/OPID: Boise Field Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 10 Standard: 9.5 ConstructionT-1 Training: F__] (T)(D) Integrity Management: Incident: M/M: = Follow-up: = Oct: o.5 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed equipment and operator qualification for the Boise, Idaho inspection units. Records and procedures for all Idaho Intermountain Gas Units were inspected in February 2020 at the Intermountain Gas Company (IGC) headquarters in Boise, Idaho. June 15-18,2020: (7.5 Standard and .5 OQ) Met with IGC company representatives in the Boise district office for in-brief and to begin field audit. Regulator Stations 40093,40095, 40096, 40097, 40098, 40099, 40100, 40132, 40133, 40136,40137, 40140, 40154, 40155, 40156, 40157, 40159,40160, 40161, 40163, 40164, 40165,40166, 40167,40168, 40169, 40170, 40171,40172, 40173, 40174, 40178 and 40180 were inspected for proper operating parameters, regulator lock- up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. Ten casing-to-carrier isolation checks, three cathodic protection rectifier,ten pipeline patrols, and ten emergency isolation valves were checked for proper operation, observations listed below. An operator qualification inspection was performed on Michael Buckner an IGC employee that was performing valve maintenance: inspection/partial operation. Michael performed the task in a satisfactory manner. An IPUC Form 3 (exit interview)was performed following the district inspection with Kelley Gorringe (Compliance/Audit Specialist) of Intermountain Gas Company. Observations: Not Plumbed for lock-up: Reg Stations: 40165, 40167, and 40170. Failed lock-up: Reg Stations: 40169 (Prim), corrected on the spot. Wrap deteriorated: Reg Stations: 40156 and 40157. Flapper needs to be lowered: Reg Station: 40100. Patrol PP-425-011 pipe was touching metal frame of hanger. Patrol ACP-425-001 gas line was touching other pipes in several locations, concern of rubbing coating away. June 19, 2020: (2 Standard Post) Completed forms and typed report. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets PHMSA IA Question Set, Field Inspection Portion (not attached but in IA database) PHMSA Form 15, (OQ) Field Inspection Forms Corrective Action Required: Yes X No Follow-up Required: b date): 18 Dec 2020 Yes X No Inspector (Lead): Date: Reviewer: Date: / de' 2D IPUC Form 1