HomeMy WebLinkAboutNorthwest Gas Processing Records Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Russo/Ulmer Date(s): May 1,4-5,7 2020 Company/Owner: Northwest Gas Processing Unit/OPID: 125223 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 6 Standard:F6 ConstructionT-1 Training: F__] (T)(D) Integrity Management: EJ Incident: M/M: F7 Follow-up: F7 oQ: F-1 Damage Prevention: D&A: Inspection Summary 2014 Records Audit Northwest Gas Processing May 1,2020: (3 Standard prep) .7-0 Prepared for the Northwest Gas Processing, records inspection through review of the PHMSA inspections Forms and 2018 inspection results. Northwest Gas Processing recordswere reviewed and compared to the PHMSA checklists for completeness. The company's pipeline system in Idaho consists of transmission and gathering lines. May 4-5, 2020: (2 Standard) Bruce Perkins/Kyle Russo of the Idaho Public Utilities Commission did a virtual/teleconference with NWGP's compliance manager Stephen Hernandez of(The Compliance Group) to review Records for the previous year 2019. The PHMSA IA program (Records Inspection) was used as a guide throughout the audit to ensure all areas were completed as they pertain to required records. May 7, 2020: (1 Standard) Wrote the inspection report, completed PHMSA and IPUC audit forms. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview(emailed to compliance personnel) Miscellaneous Operator Verification Documents will be in file on I-drive Corrective Action Required: Yesl X I No Follow-up Required: by (date): 12/16/2020 Yes I X I No Inspector(Lead): Date: Bruce Perkins �� Z Reviewer: Date: IPUC Form 1