HomeMy WebLinkAboutDominion Records Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Russo/Ulmer Date(s): Apr 8-10&14, 2020
Company/Owner: Dominion Unit/OPID: 12876/HQ
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 9
Standard: 8.5 Construction: Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A: 0.5
Inspection Summary
2020 Records Audit Dominion Energy
April 8, 2020: (3 Standard prep)
Prepared for the Dominion's records inspection through review of the PHMSA IA question set and 2018
inspection results.The company's pipeline system in Idaho consists of distribution and transmission lines.
April 9-10, 2020: (4 Standard)
Bruce Perkins and Kyle Russo of the Idaho Public Utilities Commission completed a virtual/teleconference
records inspection with Dominion's compliance personnel for the previous year 2019. The PHMSA IA question
set was used as a guide throughout the audit to ensure all areas were completed as they pertain to records.
April 14,2020: (2 Standard post)
Wrote the inspection report, completed audit forms: PHMSA IA, and IPUC Forms 1, 3, and attached inspection
documents.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
IPUC Form 2, Supplemental Questions
PHMSA Form 13, Drug&Alcohol
All pertinent records and OQ's are on the I-drive
Corrective Action Required: Yesl I Nol X
Follow-up Required: by (date): Yesl I No X
Inspector(Lead): Date:
Perkins 14-Apr-20
Reviewer: Date:
"p
IPUC Form 1