HomeMy WebLinkAboutDominion Preston Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s):1 Perkins I Date(s): Aug 10,17-19,2020 Company/Owner: Dominion Energy Unit/OPID: Field/12876 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: 3.5 Construction: Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: 0.5 Damage Prevention: D&A: Inspection Summary 2020 Field Inspection Dominion Energy August 10, 2020: (1 Standard Prep) Audit consisted of inspecting field installed equipment and operator qualification for the Franklin & Preston, Idaho inspection units. Records and procedures for all Dominion Energy Gas Units were inspected in April 2020 via a virtual/teleconference with Dominions compliance personnel August 17, 2020: (1 Standard Travel) Traveled from Boise, ID to Logan, UT. August 18, 2018: (.5 Standard, .5 OQ) Idaho Public Utilities Commission Inspector met with Dominion Energies compliance and engineering personnel at Dominion's Offices in Logan, Utah for in-brief and to begin the field audit. The PHMSA IA Form 2 (Gas Distribution Inspection) and PHMSA Form 15 (OQ Field Inspection Form) were used as a guides throughout the field audit to ensure all areas were completed. Regulator Stations FR0001, FC0001, FC0003, FC0004, FC0005, FC0006, and PS0001 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe to soil interface wrap protection, station warning signs and right-of-way clearances. Four casing-to-carrier isolation checks, one cathodic protection rectifier and nine emergency isolation valves were checked for proper operation and found to be operating properly. An IPUC Form 3 (exit interview)was performed following the inspection with Lauren Skufca (Pipeline Compliance), Clark Jarrett (Measurement& Control (M&C)Tech), Ron Kiiha (CP Tech),James Sharp (M&C Lead) of Dominion Energy. Observations: Reg Stations: FR0001, FC0001, FC0003, FC0004, FC0005, and FC0006 not plumbed for lock-up. August 19, 2018: (1 Standard Post) Completed forms and typed report. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: PHMSA IA Form 2 Question Set, Field Inspection Portion (not attached but in IA database) IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview PHMSA Form 15 OQ Field Corrective Action Required: Yes No Follow-up Required: by(date): No inspector(Lead): Date: Bruce Perkins 19-Aug-209D Reviewer: Date: Darrin Ulmer IPUC Form 1