HomeMy WebLinkAboutDominion Preston Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s):1 Perkins I Date(s): Aug 10,17-19,2020
Company/Owner: Dominion Energy Unit/OPID: Field/12876
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4
Standard: 3.5 Construction: Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: 0.5 Damage Prevention: D&A:
Inspection Summary
2020 Field Inspection Dominion Energy
August 10, 2020: (1 Standard Prep)
Audit consisted of inspecting field installed equipment and operator qualification for the Franklin & Preston,
Idaho inspection units. Records and procedures for all Dominion Energy Gas Units were inspected in April 2020
via a virtual/teleconference with Dominions compliance personnel
August 17, 2020: (1 Standard Travel)
Traveled from Boise, ID to Logan, UT.
August 18, 2018: (.5 Standard, .5 OQ)
Idaho Public Utilities Commission Inspector met with Dominion Energies compliance and engineering
personnel at Dominion's Offices in Logan, Utah for in-brief and to begin the field audit. The PHMSA
IA Form 2 (Gas Distribution Inspection) and PHMSA Form 15 (OQ Field Inspection Form) were used as
a guides throughout the field audit to ensure all areas were completed.
Regulator Stations FR0001, FC0001, FC0003, FC0004, FC0005, FC0006, and PS0001 were inspected for proper
operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe
to soil interface wrap protection, station warning signs and right-of-way clearances.
Four casing-to-carrier isolation checks, one cathodic protection rectifier and nine emergency isolation valves
were checked for proper operation and found to be operating properly.
An IPUC Form 3 (exit interview)was performed following the inspection with Lauren Skufca (Pipeline
Compliance), Clark Jarrett (Measurement& Control (M&C)Tech), Ron Kiiha (CP Tech),James Sharp (M&C
Lead) of Dominion Energy.
Observations:
Reg Stations: FR0001, FC0001, FC0003, FC0004, FC0005, and FC0006 not plumbed for lock-up.
August 19, 2018: (1 Standard Post)
Completed forms and typed report.
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Attached:
PHMSA IA Form 2 Question Set, Field Inspection Portion (not attached but in IA database)
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
PHMSA Form 15 OQ Field
Corrective Action Required: Yes No
Follow-up Required: by(date): No
inspector(Lead): Date:
Bruce Perkins 19-Aug-209D
Reviewer: Date:
Darrin Ulmer
IPUC Form 1