HomeMy WebLinkAboutAvista Training SIEO Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer/Perkins/Russo 11 Date(s): 1/13-17/2020
Company/Owner: Southern Idaho Eastern Oregon (SIEO) Unit/OPID: I Sun Valley, ID
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 12
Standard:F] Construction: F] Training: 12 (T)(D) Integrity Management: E::] Incident:
M/M: F-1 Follow-up: F-1 OQ: F-1 Damage Prevention: E:1 D&A:
Inspection Summary
Inspectors attended the 55th SIEO/NACE Winter Symposium. Received training: covering topics from NACE
International, AC Corrosion Control when CP is a Bad Thing, Integrity in Corrosion Control, 100mV Criteria, ILI
Update, New Trends in AC and Lighting Mitigation, Coupons,Trench Safety, and Wax Tapes Above Ground.
Prior to the Symposium, inspector Perkins attended the Cathodic Protection Tester Training Course presented
by Jim Jenkins, PE. Topics covered were: CP Fundamentals, Electricity Fundamentals, Basic Chemistry Related
to CP, Galvanic Corrosion, Galvanic Anode CP Systems, Impressed Current CP Systems, Soil Resistivity Testing,
Use of Current Shunts in CP Testing, Routine CP Testing Structures to Electrolyte Potentials, Routine CP Testing
Periodic Rectifier Readings, and Other Routine CP System Measurements.
January 13, 2020: (1 Training)
Traveled up to Sun Valley, ID.
January 14, 2020: (1 Training)
Attended the Cathodic Protection Tester Training Course.
January 15, 2019: (3 Training)
Attended the Cathodic Protection Tester Training Course and attended social mixer.
January 16, 2020: (3 Training)
Attended the SIEO Symposium.
January 17, 2020: (3 Training)
Completed the SIEO Symposium and traveled back to Boise, ID.
January 21, 2020: (1 Training)
Typed training report.
Attachments:
55th SIEO Winter Symposium Age da
Corrective Action Required: Follow-up Re fired: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
al ozv
Reviewer: Date:
IPUC Form 1