Loading...
HomeMy WebLinkAboutAvista Sandpoint Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins I Date(s): jJul 27-30, 2020 Company/Owner: Avista Utilities Unit/OPID: Sandpoint/31232 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 0 Z, Standard: 10 Construction: 1.5 Training: F-] (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: 15 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment and operator training for the Avista Sandpoint,Idaho inspection unit. Procedures for all Idaho Avista units were inspected during the COVID- 19 lockdown April 2020,the records inspection was postponed until 2021. July 24,2020: (2 Standard prep) Prepared for the field inspection of Avista Utility Company natural gas distribution pipeline for the Sandpoint, Idaho inspection unit. Reviewed operators Operations and Maintenance manuals, Emergency manuals, and Operator Qualification procedures. Prepared PHMSA Form 2 and IPUC worksheets for the inspection. July 27,2020: (2 Standard travel) Traveled to Sandpoint, lD to conduct inspection. July 28,2020: (2 Standard) Met with Avista company representatives in the Sandpoint, Idaho district office for in-brief and began field audit of Sandpoint installed equipment. David Applebaum(PHMSA)also attended the inspection while auditing the PUC. Regulator Stations 205, 2050, 206, 615, 616, 618 and 620 were inspected for relief operation, regulator lock-up and general condition of the station including pipe-to-soil wrap and corrosion. Two cathodic rectifiers, six steel emergency valves, one patrol and three carrier-to-casings were inspected for the Sandpoint district. Observation: No deficiencies noted during inspection, recommended sign be replaced on Carrier/Casing at Syringa and Ontario. IPUC Form 3 was conducted with Randy Bareither, Jim Kane,Jeff Lee, Steve Finney and Shawn Slinkard. July 29,2020: (1 Construction) Observed an Avista crew install two 3/4" PE service lines off 1 1/4" main in Sandpoint, Idaho. Areas observed were excavation,pipe handling/placement, tracer wire installation, welding,meter placement, EFV installation, pressure testing,padding, and backfill. July 30,2020: (2 Standard travel) Traveled back to Boise, ID. July 31,2020: (2 Standard post) Wrote the inspection report, completed audit forms: PHMSA Form 2, IPUC Form 1,IPUC Form 4 and attached inspection documents. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: PHMSA IA Question Set,Field Inspection Portion(not attached but in IA database) IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Form 4, Construction Inspection IPUC Field equipment Work sheets Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Bruce Perkins 3 I j ti 1 Reviewer: Date: IPUC Form 1