Loading...
HomeMy WebLinkAboutAvista OQ Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins Date(s): 5, 28 Sept 202 Company/Owner: Avista Unit/OPID: OQ/31232 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 3 Standard:F—] Construction: 71 Training: F—] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: F3 Damage Prevention: D&A: Inspection Summary 2020 Operator Qualification Avista Utilities 25 September 2020: (2 OQ prep) Prepared for Avista Utilities' Operator Qualification Audit through review of the PHMSA inspection Form 14, Operator Qualification Program and previous inspection results. 28 September 2020: (1 OQ) Bruce Perkins of the Idaho Public Utilities Commission completed a virtual inspection with Avista's compliance and engineering personnel to review the company's operator qualification program. The PHMSA IA question set was used as a guide throughout the audit to ensure all areas were completed as they pertain to their operator qualification plan. Attached: PHMSA Operator Qualification Inspection (IA version) IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview Operator Document Records Corrective Action Required: Yes No X Follow-up Required: hy(dat ): Yes No X Inspector (Lead): Date: y 9Sc Zv 2U Reviewer: Date: �- 2.c7 ZC7 IPUC Form 1