HomeMy WebLinkAboutNorthwest Gas Processing Records Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Russo I Date(s): ISpt 30-Oct 1,2019 Company/Owner: Northwest Gas Processing Unit/OPID: 125223 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 8 Standard:78 Construction:F] Training: F-] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary 2019 Records Audit Northwest Gas Processing September 27, 2019: (1 Standard prep) Prepared for the Northwest Gas Processing records and field inspection through review of the PHMSA inspections Forms and 2018 inspection results. The company's pipeline system in Idaho consists of transmission and gathering lines. September 30, 2019: (3 Standard) Darrin Ulmer, Bruce Perkins and Kyle Russo of the Idaho Public Utilities Commission met with NWGP's plant manager at the Hwy 30 plant in New Plymouth, ID to review records for the previous year. PHMSA Forms were used as a guide throughout the audit to ensure all areas were completed as they pertain to required records and procedures. October 1, 2019: (3 Standard) The field portion of the audit was conducted at NWGP's Hwy 30 plant, little Willow Station and valve sites to ensure compliance with field requirements. Observations: Went to take the rectifier reading at Little Willow and noticed the rectifier was off. When asked why, the tech stated he must have left it off the last time he was up taking readings the previous month (Aug). Noted casing vent needed paint and a few carsonites were down. October 2, 2019: (1 Standard) Wrote the inspection report, completed PHMSA and IPUC audit forms and attached inspection documents. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets Corrective Action Required: Yesi X No Follow-up Required: by(date): 2020 Inspection Yes X I No Inspector(Lead): Date: v Reviewer: Date: ti 9YY3 IPUC Form 1