Loading...
HomeMy WebLinkAboutIntermountain Gas 31 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Russo I Date(s): 31-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: T 8160 Inspection Type&Time (1 day) Total Inspection Days: 1 Standard:F-1 Construction: FTI Training: F__] (T)(D)Integrity Management: E::] Incident: EJ M/M: F7 Follow-up: F-1 OQ: F1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 31 Oct 2019: (1.0 Construction) Observed a Dasco crew excavating an existing 3/4" Aldyl-A service to branch off of it for a new 3/4" PE service. They squeezed the existing service, tied into it and pressure tested the branch service. They tied it in, gassed it up and shaded the services. I left before they purged the services. Typed report Areas observed during this project were: Excavating, Line locating, material handling, bedding, pipe/tracer wire installation, pressure test, EFV installation and riser installation Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes 71 No X by (date): Inspector(Lead): r Date: Kyle Russo -- ---- 10/31/2019 Reviewer: Date: ZWE17 7--, r Alov IPUC Form 1