HomeMy WebLinkAboutIntermountain Gas 30 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo I Date(s): 30-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type&Time (1 day) Total Inspection Days: 1
Standard:71 Construction: � Training: (T)(D) Integrity Management: Incident:
M/M: a Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
30 October 2019: (1.0 Construction)
Observed the crew performing a new HPSS service installation. They had excavated the 6" HP main on
Locust Grove and trenched into the property up to the house then bored under the private drive to the
meter location. They installed an. EFV on the PE and steel service lines. They backfilled the PE service
before pressure testing. Nitrogen tested the 1/4" steel HP service to 600#.
Areas observed during this project were: Excavating, Boring,Welding, Backfilling, Pressure testing
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF 71 by(date):
Inspector (Lead): Date:
10/30/2019
Reviewer: Date:
IPUC Form 1