HomeMy WebLinkAboutIntermountain Gas 28 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo I Date(s): 28-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard:FI Construction: � Training: F__� (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
28 Oct 2019: (1.0 Construction)
Observed a Dasco crew installing a new service with an EFV. They used proper bedding and shading
procedures and left a stub and stub marker for the future property next door. Pressure tested the service
and tied it in. Typed up report
Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
Kyle Russo 4 T__ - G' 10/28/2019
Reviewer: Date:
r
c 2e/e
�r
IPUC Form 1