Loading...
HomeMy WebLinkAboutIntermountain Gas 28 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo I Date(s): 28-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:FI Construction: � Training: F__� (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 28 Oct 2019: (1.0 Construction) Observed a Dasco crew installing a new service with an EFV. They used proper bedding and shading procedures and left a stub and stub marker for the future property next door. Pressure tested the service and tied it in. Typed up report Areas observed during this project were: Excavating, Line locating, Pressure testing, Backfilling Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Kyle Russo 4 T__ - G' 10/28/2019 Reviewer: Date: r c 2e/e �r IPUC Form 1