HomeMy WebLinkAboutIntermountain Gas 25 Nov Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Russo Date(s): 25-Nov-19 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:71 Construction: 51-1 Training: F7 (T)(D) Integrity Management: Incident: M/M: = Follow-up: F-1 OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 25 Nov 2019: (1.0 Construction) Observed a Dasco crew installing a new service. Safe excavation practices were used and they inserted the service into a conduit that was previously installed before the driveway was poured. Typed up report. Areas observed during this project were: Excavating, Squeezing, Pressure testing,Tie-in Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by (date): Inspector (Lead): Date: Kyle Russo Reviewer: Date: // IPUC Form 1