HomeMy WebLinkAboutIntermountain Gas 25 Nov Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Russo Date(s): 25-Nov-19
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:71 Construction: 51-1 Training: F7 (T)(D) Integrity Management: Incident:
M/M: = Follow-up: F-1 OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
25 Nov 2019: (1.0 Construction)
Observed a Dasco crew installing a new service. Safe excavation practices were used and they inserted
the service into a conduit that was previously installed before the driveway was poured. Typed up report.
Areas observed during this project were: Excavating, Squeezing, Pressure testing,Tie-in
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by (date):
Inspector (Lead): Date:
Kyle Russo
Reviewer: Date: //
IPUC Form 1